ML19263B364
| ML19263B364 | |
| Person / Time | |
|---|---|
| Issue date: | 10/11/1978 |
| From: | Potapovs U NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Arnold W WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
| Shared Package | |
| ML19263B352 | List: |
| References | |
| REF-QA-99900404 NUDOCS 7901180106 | |
| Download: ML19263B364 (2) | |
Text
m R8c j
oq UNITED STATES
,; jo NUCLEAR REGULATORY COMMISSION y N o
REGION IV 5d E
611 RYAN PLAZA DRIVE, SUITE 1000 f
[
110GT 1978 Docket No.
99900404/78-03 Westinghouse Electric Corporation ATTth Dr. W. H. Arnold, General Manager PWR Systems Division Post Office Box 355 Pittsburgh, Pennsylvania 15230 Gentlemen:
This refers to the QA Program Inspection conducted by Mr. D. G. Anderson of this office on September 25-28, 1978, of your facility at Monroeville, Pennsylvania, and to the discussions of our findings with Mr. E. J. Kreh, and members of your staff at the conclusion of the inspection.
Areas examined during the QA Program inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.
During this inspection it was found that the implementation of your Quality Assurance Program failed to meet certain NRC requirements. The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.
Please provide us within thirty (30) days a written statement containing, (1) a description of any steps that have been or will be taken to correct this item, (2) a description of any steps that have been or will be taken to prevent recurrence, and (3) the dates your corrective actions and preventive measures were or will be completed.
In accordance with Section 2.790 of the Commission's " Rules of Practice,"
Part 2, Titic 10, Code of Federal Regulations, a copy of this letter and your reply together with the enclosed inspection report will be placed in the Commission's Public Document Room.
If this report contains any information that you believe to be proprietary, it is necessary that you make a written application within thirty (30) days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of thich it is claimed that the information is proprietary, and should be irepared so that proprietary information identified in the application is contained in a separate part of the document.
If we do not hear from you in this regard within the specifiea g iod, the report will be placed in the Public Document Room.
790118 0/06
e.
Westinghouse Electric Corporation Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, d
WP Uldis Potapovs, Chief Vendor Inspection Branch
Attachment:
1.
Notice of Deviation 2.
Inspection Report No. 99900404/78-03
.