Responds to NRC 781206 Ltr Re Violations Noted in IE Insp Rept 50-466/78-03 on 781114-17.Corrective Actions:Records Mgt Sys Procedures Will Be Revised to Verify QA Plan Reviewed & Procedures Revised by 781208
ML19263B357
Person / Time
Site: Allens Creek File:Houston Lighting and Power Company icon.png
Issue date: 12/19/1978
From: Eric Turner
HOUSTON LIGHTING & POWER CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19263B354 List:
References
AC-HL-AE-270, NUDOCS 7901180095
Download: ML19263B357 (2)


Text

y pg Houston f: 5 Lighting 11 $p h & Power i y Company a

ha Electric Tower December 19, 1978 RO. Box l700 J  ;,' Houston. Texas 77001 AC-IIL- AE-2 70 Mr. W. C. Seidic, Chief Reactor Construction and Engineering Support Branch U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

RESPONSE TO NRC INSPECTION FINDINGS ALLENS CREEK NCS - UNIT NO. 1 DOCKET NO. 50-466/RPT. 78-03

Dear Mr. Seidle:

The following is our response to the deviation identified in IE Inspection Report No. 50-466/Rpt. 78-03, dated December 6, 1978:

I.

Failure to Include a Method Of Verification Of QA Records In Written Procedures A. Corrective Action The Records Management System procedures will be revised, as appropriate, to de-scribe the method used to verify QA re-cords.

B. Action to Preclude Recurrence The Allens Creek Project Quality Assurance Plan and departmental procedures will be reviewed to ensure that the required methods are described in the procedures.

C. Date Action Will Be Completed and Full Compliance Achieved The Records Management System procedures will be revised and approved by December 28, 1978. The review of departmental pro-cedures and Allens Creek Quality Assurance Plan will also be completed by December 28, 1978.

790118009g

IIouston kige.ng & Pmtr Company

, f!r. Seidle December 19, 1978 Page Two h'e t rus t that you will find this response satisfactory.

Should you require any further clarification or information, please advise.

Very truly yours,

[a . /-

E. A. Turner, Vice President Power Plant Construction G Technical Services Fh'S : rka cc: fir. R. A. Frazar b!r. P. A. Ilorn