Q NUCLEAR REGULATORY COMMISSION
$ -}
. j 611 RYAN PLAZA DRIVE, SUITE 1000 p
o REGION IV O
- *E
%,,,,. **'f 31 OCT 1978 Docket No. 99900053/78-01 Anchor / Darling Valve Company ATTN: Mr. W. A. Benning Senior Vice President One Belmont Avenue, Suite 320 Bala Cynwyd, Pennsylvania 19004 Gentlemen:
ThisreferstotheQdPrograminspectionconductedbyMr.Wm.D.Kelley of this office on October 16-19, 1978, of your facility at Williamsport, Pennsylvania, associated with the manufacture of ASME Section III "N"
Class 1, 2, and 3 valves and to the discussion of our findings with members of your staff at the conclusion of the inspection.
This inspection was made to confirm that, in the areas inspected, your QA Program is being effectively implemented. The inspection effort is not designed to assure that unique quality requirements imposed by a customer are being implemented; nor to assure that a specific product, component or service provided by you to your customers, is of acceptable quality. As you know, the NRC requires each of its licensees to assume full responsibility for the quality of specific products, components or services procured from others. You should therefore not conclude that the NRC's inspection exempts you from inspections by an NRC licensee or his agents nor from taking effective co~ective action in response to their findings.
Areas examined during the inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector. Within the scope of this inspection, we found no instance where you failed to meet NRC requirements.
In accordance with Section 2.790 of the Commission's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter together with the enclosed inspection report will be placed in the ConTaission's Public Document Room.
If this report contains any information that you believe to be pop. Mtary, it is necessary that you make a written application within thirty (30) days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the 79 010 4 0 I ;;to
~
Anchor / Darling Valve Company information is proprietary, and should be prepared so that p.
1rietary information identified in the application is contained in a separate part of the document.
If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, 20 ti' jh, _,
)&GENO Uldis Potapovs, Chief Vendor Inspection Branch