ML19262C597

From kanterella
Jump to navigation Jump to search
Forwards Final Deficiency Rept Re Gulf & Western Preassembled Formations
ML19262C597
Person / Time
Site: Wolf Creek, Callaway  Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 11/29/1979
From: Petrick N
STANDARDIZED NUCLEAR UNIT POWER PLANT SYSTEM
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19262C598 List:
References
NUDOCS 8002140621
Download: ML19262C597 (2)


Text

-

  • ' , if V /

SNUPPS Standardized Nucieer Unit Power Plant System 5 Choke Cherry Road Nicholas A. Petrick Rockville, Maryland 20850 Executive Director (301) 869 4010 November 29, 1979 SLNRC 79- 20 FILE: 0491.10.2/M-206 SUBJ: Gulf & Western Preassembly For-mations: SNUPP5 Units I Wolf Creek and 2 (Callaway 1

/r.M Boyce Grier Director, Region 1 Office of Inspection and Enforcement U. S. Nuclear Regulatory Comission 631 Park Avenue King of Prus nnsylvania 19406 ErhY STN 50-485 STN 50-586

Dear Mr. Grier:

On November 2,1979, the Nuclear Regulatory Comission IE Region III was informed by Union Electric of deficiencies in three (3) pre-assembly piping formations at Callaway site. These deficiencies were reported by telecon to Ms. Jolene DuBry of Region III pursuant to the requirements of 10CFR50.55(e). Since that date and, based upon examinations of other formations involving both Callaway and Wolf Creek Units, these deficiencies are considered to be generic in nature and therefore applicable to all SNUPPS units.

Enclosed with this letter is a report of the referenced preassembly formations. This report describes the deficiencies in preassembly fabrication, inspection, and NDE; provides a brief chronology of related events; summarizes potential safety implications resulting from these deficiencies and outlines follow-up corrective acticns that have been initiated. Follow-up actions to rework on site and, where necessary, repair Gulf & Western furnished preassembly formations are being initiated by the jobsite constructors and will be processed in accordance with existing site rework procedures and controls. No further work by Gulf & Western (G&W) on safety-related preassembly formations for other SNUPPS Units; i.e. Sterling or Callaway No. 2, will be authorized by SNUPPS without demonstration of substantial improvements on the part of GLW in welding, NDE, QA and management controls, f 2I 90 02146 M

Page Two, -

The deficiencies described in the enclosed report have also indicated need for improvements in Bechtel and Code Authorized Nuclear Inspector (ANI) surveillance and inspection functions. Actions to strengthen the Bechtel effort have been initiated. Steps to re-examine the ANI function are being established and will be pursued separately.

Verytstruly yours,

\f%c Nicholas A. Petrick SJS/bds/la4

Enclosure:

Final Report on Gulf & Western Preassembly Formations.