ML19262C590
| ML19262C590 | |
| Person / Time | |
|---|---|
| Site: | Humboldt Bay |
| Issue date: | 02/04/1980 |
| From: | Weeks E PACIFIC GAS & ELECTRIC CO. |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML19262C591 | List: |
| References | |
| NUDOCS 8002140597 | |
| Download: ML19262C590 (1) | |
Text
.
PACIFIC GAS AND E LE C T RIC C O M PANY b
[
1034 SIX T H STREET EUREKA. C A LI Fo R N I A 9 5 501 (707) 443 0821
=
ROY C. ATKIN S Hwmeosof o.vis+6e masemate February 4, 1980 Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: Docket No. 50-133 License No. DPR-7 Gentlemen:
Enclosed are the completed monthly report foms and the narrative of operating and major maintenance experience for Humboldt Bay Power Plant Unit No. 3 (HBPP-Unit 3) for January,1980. These forms and the narrative are submitted in accordance with Section IX I.l.c of our Technical Specifications.
Sincerely, e BcJJs, wY E. D. Weeks Plant Superintendent Humboldt Bay Power Plant 1034 Sixth Street Eureka, California 95501 (707-443-2787)
Enclosure cc:
Mr. W. H. Barr Mr. R. H. Engelken, Director Directorate of Regulatory Operations Region V Office U. S. Nuclear Regulatory Commission 1990 N. California Boulevard Walnut Creek Plaza, Suite 202 Walnut Creek, California 94596 002 b
EDWeeks:=c
///
80 02140 M4