ML19262C500
| ML19262C500 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 01/15/1980 |
| From: | Lainas G Office of Nuclear Reactor Regulation |
| To: | Reid R Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19262C501 | List: |
| References | |
| NUDOCS 8002140093 | |
| Download: ML19262C500 (2) | |
Text
.
O y-DISTRIBUTI0ft Central filh NRC POR
, 9' PSB Reading fiE!10RANDUM FOR:
R. F.eid, Chief, Operating Reactors Branch 14, 00R F R0!!:
G. Lainas, Chief, Plant Systens Branch, DOR
SUBJECT:
REVIEW 0F ARKANSAS NUCLEAR ONE, UNIT 2, PROPOSED TECHNICAL SPECIFICATION CHA!lGE - HIGH PRESSURIZER PRESSURE TRIP SETPOINT (TAC 12543)
Plant Name: Arkansas Nuclear One, Unit 2 (ANO-2)
Docket No.:
50-368 Responsible Branch:
ORBf4 Project !!anager:
G. Vissing Reviewing Baanch:
Plant Systens Sranch Status:
Complete In response to technical assistance request TAC 12543, the Plant Systers Branch has reviewed the licensee's proposed technical specification change - high pressuri:'er cressure trip setpoint submitted in its letter of November 27, 1979.
Based on our review, we find the proposed change to technical specification - high pressurizer pressure trip setroint to be acceptable. The bases for these findings are <ietailed in our enclosed safety evaluation. The transient analysis aspects of this change of the hiqh pressurizer pressure trip setpoint will be addressed in the Reactor Safety Branch's safety evaluation.
G. Lainas, Chief Plact Systems Branch Division of Operating Reactors
Enclosure:
As stated Con tact:
J. Burdoin X-28128
- ../ :;;1 c u r;:
SL,-PSB:00g, C-PSB:00R
.me. @e.page 2
,PSB:
DTondi b' Gla.inas _
i ears >
NEC FWGM 314 (9-74) NECW 0244
'/f w s * *va a aassa r ** *=viae *** *c *
- s o r e - se e - s e e 8002140
. JAN 131533 cc w/ enclosure:
D. Eisenhut B. Grimes G. Zech W. Gammill P. Check S. Weiss S. Sands G. Lainas D. Brinkman G. Vissing D. Tondi J. Burdoin