ML19262C492

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-225/79-03 & 70-0920/79-01 on 791107-09.No Noncompliance Noted
ML19262C492
Person / Time
Site: Rensselaer Polytechnic Institute, 07000920
Issue date: 12/18/1979
From: Martin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Low G
RENSSELAER POLYTECHNIC INSTITUTE, TROY, NY
Shared Package
ML19262C493 List:
References
NUDOCS 8002140083
Download: ML19262C492 (2)


See also: IR 05000225/1979003

Text

f "84g

74

.

,#

UNITED STATES

o,i

E

NUCLEAR REGULATORY COMMISSION

z

REGION I

%*****,o#[

O,

631 PARK AVENUE

K NQ oF PRUSSIA, PENNSYLVAN!A 19406

'I8 03 1979

Docket No. 50-225

70-920

Rensselaer Polytechnic Institute

ATTN:

Dr. George M. Low

President

Troy, New York 12181

Gentlemen:

Subject:

Combined Inspection 50-225/79-03; 70-920/79-01

This refers to the inspection conducted by Mr. E. Woltner of this office on

November 7-9, 1979 of activities authorized by NRC License Nos. CX-22 and

SNM-910 at the Rensselaer Critical Facility, Schenectady, New York, and at the

Troy, New York, Campus and to the discussions of our findings held by Mr. E.

Woltner with Mr. R. Ryan at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

insnector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Roorr..

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20

days to this office to withhold such information from public disclosure.

Any

such application must be accompanied by an affidavit executed by the owner of

the information, which identifies the document or part sought to oe withheld,

and which contains a statement of reasons which addresses with specificity the

items which will be considered by the Commission as listed in subparagraph (b)

(4) of Section 2.790.

The information sought to be withheld shall be incor-

porated as far as possible into a separate part of the affidavit.

If we do

not hear from you in this regard within the specified period, the report will

be placed in the Public Document Room.

800214o 0 8

.

.

.

Rensselaer Polytechnic Institute

2

tj 8 CEC 1979

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

%

W

/

alter G. Martin, Chief

Safeguards Branch

Enclosure:

Office of Inspection and Enforcement Combined Inspection Report

Numbers 50-225/79-03 and 70-920/79-01

cc:

Dr. G. Judd, Vice Provost

Dr. D. R. Harris, Facility Director

Dr. R. T. Lahey, Chairman, Department of Nuclear Engineering and Science

.