Supersedes 791005 Response to IE Bulletin 79-05A,Revision 2. Util & NRC Reached Agreement Re Item 12 of IE Bulletin. Outlines Requirements for Notification of NRC When Reactor Is Not in Controlled Condition
ML19262C438
Person / Time
Site: Rancho Seco
Issue date: 10/26/1979
From: Rodriquez R
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
IEB-79-05A-R2, IEB-79-5A-R2, NUDOCS 8002130212
Download: ML19262C438 (2)


Text

'G SMUD SACRAMENTO MUNICIPAL UTILITY DISTRICT O 6201 S Street, Box 15830. Sacramento, California 95813; (916) 452-3211 RJR 79-473 October 26, 1979

/,$'

?,.x

.)

p' Mr. R.

II. Engelken, Director jh 5,a.,;MI; Region V Of fice of Inspection & Enforcement p if,\\ '

o, O

U. S. Nuclear Regulatory Commission Q

$' - N;,'d 1990 North California Boulevard

't d "

rn -

v Walnut Creek Plaza, Suite 202 y 'g y >n i'-

W "-

Walnut Creek, California 94596 Docket No. 50-312 Rancho Seco Nuclear Generating Station, Unit No. 1 Bulletin 79-05A Rev. 2

Dear Mr. Engelken:

The Sacramento Municipal Utility District has reached an agreement with Mr. R. Capra (NRC) to revise our response of May 2,1979 concerning item 12 of IE Bulletin 79-05A.

This letter supersedes the one sent to you on October 5, 1979.

A Standing Order will be issued to all opeating personnel that the NRC shall be notified within one hour from the time the reactor i.s not in a controlled or expected condition of operation. The District has defined "the NRC" as the Duty Of ficer in Bethesda, Maryland. The District has defined "the reactor is not in a controlled or expected condition of operation" as a change in electrical generator output of more than 50 MWe which is not scheduled.

If the reactor is shut down, the NRC will be notified within one hour if unplanned cessation of reactor coolant flow occurs. An open communications channel is defined as a speaker phone located in the Control Room area (Red Telephone "llot Line") which will allow the Duty Officer the capability of listening to activities occurring althin the Control Room.

In addition to the above requirements, any time when the reactor is in an of f normal transient condition, the Shift Supervisor will notify a man-agement member. This person will he the Manager of Nuclear Operations, the Plant Superintendent, the Engineering and Quality Control Supervisor or the Operations Su; zisor. These staff members have Senior Reactor Operators Licenses ana are qualified to determine when a condition is not within the Shift Supervisor's guidelines but reportable. The Senior

taf f member will, when evaluatin;; a report, determine NRC reportability and take the necessary actions, one of which will he having the reporting Shift Supervisor use the Dedicated Telephone "llo t Line" to notify the NRC of the transient.

8 0 () o 13 0WF

~

7 E!

isl0 :13 f 19 S E R V ' ** G VCRF T H A 'i ~ 0 0.10 IN THE HEART OF C A l l f 0 R fi l A

~!d.

WA

Mr. R. II. Engelken, Director October 26, 1979 This conmunications channel shall remain open for each notification until the NRC personnel agree that it is no longer required.

% spec fully submitted,

f jg

'S r

\\

', 'w Q R. J.

mdrigut' Manager, Nucit Operations RJR:RWC:jr