Forwards LER 80-001/01T-0
ML19262C088
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 01/22/1980
From: Warembourg D
PUBLIC SERVICE CO. OF COLORADO
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19262C089 List:
References
P-80007, NUDOCS 8001280280
Download: ML19262C088 (3)


LER-1980-001, Forwards LER 80-001/01T-0
Event date:
Report date:
2671980001R00 - NRC Website

text

_ _ _ _.

Public service company oe celeasnIe

($

16805 Wald County Road 191/2, Platteville, Colorado 80651 C.

)

January 22, 1980 Fort St. Vrain Unit No. 1 P-80007 Mr. Karl V. Seyfrit, Director Nuclear Regulatory Commission Region IV Office of Inspection and Enforce =ent 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76012

Reference:

Facility Operating License No. DPR-34 Docket No. 50-267

Dear Mr. Seyfrit:

Enclosed please find a copy of Reportable Occurrence Report No. 50-267/90-01, Preliminary, submitted per the requirements of Technical Specification AC 7.5.2(x)3.

Also, please find enclosed one copy of the Licensee Event Report for Reportable Occurrence Report No. 50-267/80-01.

Very truly yours,

$W Don Warembourg Manager, Nuclear Production DW/cis cc: Director, MIPC 1816 087 ok poS' IfI 8 0012eo 2 g q)

REPORT DATE:

January 22, 1980 REPORTABLE OCCURRENCE 80-01 ISSUE O OCCURRENCE DATE: Januarv 8, 1980 Page 1 of 2 FORT ST. VRAIN NUCLEAR CENERATING STATION PUBLIC SERVICE COMPANY OF COLORADO 16805 WELD COUNTY ROAD 19 t/2 PLATTEVILLE, COLORADO 8 REPORT No. 50-267/80-01/01-T-0 PRELIMINARY IDENTIFICATION OF OCCURRENCE:

On Tuesday, January 8,1980, while operating the plant at approximately 1.5% of rated power, it was determined that a leak existed on the IB helium circulator static seal actuating mechanism which caused continuous bleed-off of the seal pressurizing system. This leak is internal to the circulator.

This event is reportable per Fort St. Vrain Technical Specification AC 7.5.2(a)3.

EVENT

DESCRIPTION

On Januarv 8,1980, with the reactor critical at less than 2% power, operating personnel were conducting training starts on the IB helium circulator when static seal operation became errattic. The brake and seal gas bot-tie pressure could not be maintained. The system was checked and no external leaks could be found. A test was conducted which confirmed there was leakage internal to the circulator. At that time, the reactor was shutdown and depressuriaation began.

CAUSE

DESCRIPTION:

The cause of the circulator static seal malfunction is undetermined at this time.

CORRECTIVE ACTION:

The circulator is being removed and will be repisced by a spare circulator.

The static seal malfunction will be investigated and a final report sub-mitted when the cause of the malfunction is determined.

1816 088

REPORTABLE OCCURRENCE 80-01 ISSUE O Page 2 of 2 Prepared By:

/

d/t.

Asa'3. Reed Technical Services Technician s

/

l: l Revteued By' l V <J ::V J/ W. Galiin echnical Services Supervisor Nb Reviewed By:

Frank M. Mathie Operations Manager Approved By:

d

  1. wdw Don Warembourg ff Manager, Nuclear Production v.

1816 089