ML19262B990

From kanterella
Jump to navigation Jump to search
Forwards LER 79-102/03L-0 & Updated LER 79-008/03X-1
Date released: 10/03/2019 Download: ML19262B990


Updated LER 79-008/03X-1:on 790114,during Mode 1 Operation, Refueling Water Tank Level Transmitter Sensing Line Froze. Caused by Burnout of Heat Lamp in Transmitter Box.Lamp Replaced
ML19262B997
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/18/1980
From: Shively C
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19262B997 (1)
LER 79-102/03L-0:on 791221,during Mode 1 Operation,Core C Protection Calculator Failed.Caused by Speed Input Failure. Since Failure Was in Conservative Direction,Unit Returned to Svc
ML19262B995
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/18/1980
From: Pendergraft R
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19262B995 (1)
Forwards LER 79-102/03L-0 & Updated LER 79-008/03X-1
ML19262B989
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/18/1980
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: SEYFRIT K V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19262B989 (1)