Forwards Response to IE Bulletin 79-25, Failures of Westinghouse Bfd Relays in Safety-Related Sys. Relays Not in Use in safety-related Sys
ML19262B925
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/20/1979
From: Hines E
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-79-25, NUDOCS 8001220125
Download: ML19262B925 (2)


Text

'

Edward Hines

, Assistant Vte President ovanty Assurance Detroit 3331 W B Edison mw,gBeaverRoad "

December 20, 1979 EF2-47,344 Mr. James G. Keppler Regional Director United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137

References:

o Enrico Fermi Power Plant, Unit 2 e USNRC Licensing Docket 50-341 e USNRC IE Bulletin 79-25 of November 2, 1979 e Edison Memorandum EF2-47,416 of Decmber 18, 1979 W. F. Colbert to R. W. Barr

Subject:

Detroit Edison Response to USNRC IE Bulletin 79-25 Failures of Wes'.inghouse BFD Relays in Safety-Related Systems *

Dear Mr. Keppler:

The enclosed Edison internal memorandum, EF2-47,416 of December 18, 1979 is transmitted to you in response to IE Bulletin 79-25.

Should you require additional information about this subject, please advise us.

Very truly yours, M. I< d/p c. A DEC 311978 EH/HE/Im Enclosure cc: Mr. John G. Davis, Acting Director Office of Inspection and Enforcement Division of Reactor Inspection Programs U.S. Nuclear Regulatory Coc: mission Washington D.C. 20555 Director Office of Inspection and Enforcement Division of Reactor Operation Inspection U.S. Nuclear Regulatory Commission Washington D.C. 20555 178 r-3 027 8001220;2 5

<-t Detroit -

ENRICO FERMI UNIT 2 PROJECT ENGINEERING December 18, 1979 EF2 - 47416 Ta: R. W. Barr RECEIVED Project Q. A. Director, EF2 206 Engineering Construction-Troy DEC : 91979 From: W. F. Colbert R. W. BARR Project Engineer, EF2 318 Engineering Construction-Troy

Reference:

IE Bulletin 79-25

Subject:

Failure of Westinghouse BFD Relays IE Bulletin 79-25 discusses failure of Westinghouse type BFD control relays. The relay contains an epoxy adhesive which can soften and flow from the heat of a normally energized coil. The adhesive binds the relay armature in the energi:cd position, preventing it from dropping out.

Some models of the replacement relay, type NBFD, possess insuffi-cient overtravel (the armature does not move far enough to make all the contacts).

At Enrico Fermi 2, Westinghouse type BFD relays are not employed nor are they planned to be for safety related systems; therefore, no cor-rective action is required.

V. Wagner Written by:

/dk

[

cc: E . R. B:' .s e t t i E. Lusts J. W. Wanless J. W. Nunley

, F. Barnes Document Control (Closes Action Item 47108) 1785 028