/PDR 4
UNITED STATES
[
,,p'l h NUCLEAR REGULATORY COMMISSION
,.; Q,, =p,.
C WASHINGT ON, D. C. 20555 s ?~MMf DEC 181979
%,.".... /
Mr. Marvin fiorin Nuclear Program Quality Assurance Department of Energy Germantown, MD 20767 Mail Stop B107
Dear Mr. ilorin:
Recent events in the conmercial nuclear power industry including the accident at the Three Mile Island Facility have raised a number of questions regarding the adequacy of NRC requirements for protection of the public health and safety.
One of these questions concerns the adequacy of the quality assurance requirements applied to the activities involved in the design, construction, and operation of nuclear power plants.
This question has caused us to reassess the quality assurance requirements that NRC imposes on the nuclear power indus-try to determine the need for additional controls and clarification for existing controls. As part of this reassessment, we are strongly interested in examining and comparing the specific philosophy and requirements that form the basis of the quality assurance programs for other Federal agencies, and their contractors, such as D0D (Navy, Army, and Air Force), 00E, FAA, and NASA.
To this end, we would very much appreciate your making available to us the first and second tier documents that describe the overall philosophy and requirements for your quality assurance program. We would also like to arrange a meeting with you or your designee in the very near future to discuss your approach to QA, to obtain these documents, and to further discuss our needs.
We plan to be in touch with you shortly to make mutually acceptable arrangements for our proposed meeting.
Sincerely,
^
.a w g
alter P. Haass, Chief Quality Assurance Branch Division of Project Management 912 810 Wh
'