Final Deficiency Rept Re Reactor Bldg Spray Piping Supports. Stresses Are within Code Allowables.Grinnell Analysis & Plant Drawings Reconciled W/Actual Hardware.Plant Is in Conformance W/Design Requirements
ML19262B570
Person / Time
Site: Midland
Issue date: 12/21/1979
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
HOWE-320-79, NUDOCS 7912280483
Download: ML19262B570 (1)


Text

COIISumBIS o(#,h u POW 8f g g Stephen H. Howell Senior Vice President General Offices: 1945 West Pernall Road, Jackson, Michigan 49201 * (517) 788 0453 December.21, 1979 Hove-320-79 Mr J G Keppler, Regional Director Office of Inspection and Enforcement US Huclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND NUCLEAR PLANT UNIT N0 1, DOCKET N0 50-3' UNIT NO 2, DOCKET NO 50-330 REACTOR BUILDING SPRAY PIPING SUPPORTS

References:

1) S H Howell letter to J G Keppler; Midland Nuclear Plant; Unit No 1, Docket No 50-329; Unit No 2, Docket No 50-330; Reactor Building Spray Piping Supports; Serial Hove-131-79; dated May 1, 1979
2) S H Howell letter to J G Keppler; Midland Nuclear Plant; Unit No 1, Docket No 50-329; Unit No 2, Docket No 50-330; Reactor Building Spray Piping Supports; Serial Hove-272-79; dated October 19, 1979 Reference 1 had been submitted as a final report on the subject of the Reactor Building Spray Piping Supports. Subsequent to that report , it was determined that six ring girder supports in Unit 2 had not been installed in accordance with their design drawings. Reference 2 reopened the 50.55(e) report concerning the analysis of the spray piping supports based on their actual configuration. This let+c is our final report on this subj ect.

ITT Grinnell has completed their analysis of the as-installed configuration of the six supports and has determined that the stresses are within Code allowables. The Grinnell analysis and the plant drawings have been recon-ciled with the actual hardware and the plant is now in conformance with design requirements.

G .

WRB/lr CC: Director of Office of Inspection & Enforcement Att: Mr Victor Stello, USHRC (15)

Director, Office of Management Information & Program Control, USNRC (1) 1,93 ?u, ,