.s r1 s l I
w 9
UNITED STATES
[e arc,%,*
o NUCLUAR REGULATORY COMMISSION O
REGloN IV E
)
o 611 RY AN PLAZA oRIVE, SUITE 1000
.J ARLINGTON TEXAS 76012 o
i 2 6 NOV !373 Docket No. 99900505/79-04 Ebasco Services, Inc.
Attn:
Mr. B. E. Tenzer, Director Materials Engineering and Quality Assurance Two Rector Street New York, New York 10006 Gentlemen:
This refers to the QA Program inspes* ion conducted by Mr. J. R. Costello of this office on October 29-November 2, 1979, of your facility at New York, New York, and to the discussions of our findings with you and members of your staff at the conclusion of the inspection.
Areas examined during the QA Program inspection and our findings are discussed in the enclosed report. 41 thin these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, we found no instance where you failed to meet the commitments of your Topical Report No. ETR-1001.
In accordance with Section 2.790 of the Commission's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter together with the enclosed inspection report will be placed in the Commission's Public Document Roem.
If this report contains any information that you believe to be proprietary, it is necessary that you make a written application within thirty (30) days to this office to withhold such information from public disclosure.
Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document.
If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
1532 138 29121to D /
Ebasco Services, Inc.
2 Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
{.
Uldis Potapovs, Chief Vendor Inspection Branch
Enclosure:
Inspection Report No. 99900505/79-04 1532 139