Notifies of Delay in Final Deficiency Repts Re Emergency Diesel Generators,Defective Shaft Springs & Roller Pins. Manufacturer Has Ordered New Mod Assemblies for Roller Pins. Final Rept Submitted by 800315
ML19262A609
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/31/1979
From: Aswell D
LOUISIANA POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 7912070145
Download: ML19262A609 (2)


Text

k4 [ZC

/

r"'"

b LoulSIANA POWER & LIGHT

,e minONDE smm P O BOX 6008

  • NEW ORLEANS. LOUISIANA 70174 . (504) 366-2345 8

E$uS$3YS October 31, 1979 o < asuu v%C e PrT, Cent DMe* P"C&Ct&

LPL 12319 Q A35 . 07. 06 3-A1.01.04 Mr. K. V. Seyfrit, Director, Region IV U. S. Nuclear Regulatory Commission Office M inspection and Enforcenent 611 Ryan Plaza Drive, Suite 1000 Arlington, Ter.as 76012

SUBJECT:

Waterford SES - Unit No. 3 Docket No. 50-382 Status of Significant Construction Deficiencies No. 6 " Emergency Diesel Generators-Defective Shafts & Springs" No. 10 " Defective Emergency Generator Roller Pin"

REFERENCE:

a) LP&L Letter, LPL 10343 dated December 29, 1978 b) LP&L Letter, LPL 10233 dated December 5, 1978 As Amended by LPL 10316 dated December 19, 1978 As Amended by LPL 11903 dated August 31, 1979

Dear Mr. Seyfrit:

In accordance with the requirements of 10CFR50.55(e), LP&L has previously submitted interin reports of the two Significant Construction Deficiencies concerning the emergency diesel generators. Based on communications with Cooper-Bessemer, the manufacturer of the diesel generators, LP&L reported in the referenced letters that modifications correcting the deficiencies were scheduled to be completed and final reports submitted by November 1, 1979.

Cooper-Bessemer has informed us that the modification assemblies were rejected and reordered. New modification assemblies for the defective emergency gener-ator roller pins are now scheduled to be shipped by November 15, 1979. This delay by Cooper-Bessemer still'does not adversely impact Waterford 3 construc-tion needs and is acceptable.

Based on the above, in addition to adding adequate time fot inspection and installa. tion activities, we will now submit final reports for Significant Construction Deficiencies No. 6 and No.10 by }brch 15, 1980.