ML19262A521

From kanterella
Jump to navigation Jump to search
Summarizes 670628 Meeting W/Util Re Operator Training Program & Licensing Procedures
ML19262A521
Person / Time
Site: Crane  Constellation icon.png
Issue date: 06/28/1967
From: Collins P
US ATOMIC ENERGY COMMISSION (AEC)
To:
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19262A522 List:
References
NUDOCS 7911130525
Download: ML19262A521 (1)


Text

~'

. i.

. u m,

UNITED STATES GOVERNMENT Memorandum TO DATE FILES June 28, 1967 Paul F. Collins, Operator Examiner,9 d/Q FROM THREE MILE ISLAND NUCLEAR GENERATING STATION E BJE m Information Meeting June 28, 1967 On June 28, 1967, representatives of Metropolitan Edison Company visited the office to discuss their operator training program and licensing procedures fo the Three Mile Island Nuclear Generating Station.

The following persons attended:

s Metropolitan Edison Atomic Energy Comm1~ Ion J. G. Miller, Chief Engineer Frank L. Kelly J. S. Bartman, Supt. of Production Paul F. Collins J. L. Wise, Plant Supt.

R. O. Keim, Director, Education TRAINING PROGRMi--

Metropolitan Edison plans to conduct a four-phase training program for the supervisory personnel.

Phase I Academic (Possible research reactor practical training included) 6 mos.

Phase II - Nuclear station training (Saxton) 6 mos.

Phase III - Vendor design training (B&W) 2 mos.

Phase IV - On site training.

18 mos.

All non-supervisory personnel will be trainied on site by the supervisory personnel.

LICENSING PROCEDURES --

The following items sere discussed:

1.

Qualifications for " cold" and " hot" examinations.

2.

Scheduling 221J 073 3.

Content of Examinations 4.

Re-Examinations.

The following literature was given to J.L. Wise:

Typical applications, medic forms, AEC Forms 3, 4 and 5, and a list of available bcoks that could be useful in the training program.

N 911180 f~)S-