ML19262A322
| ML19262A322 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/15/1974 |
| From: | Jennifer Davis US ATOMIC ENERGY COMMISSION (AEC) |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML19262A319 | List: |
| References | |
| CDR-270, NUDOCS 7910260649 | |
| Download: ML19262A322 (1) | |
Text
.
Tc:
J. P. C
! illy, R0:I FSLE3 ACTICN CONT 2CL FORM A.
Action Code CDP 1270 Na=e of Licensee and Facility Metropolitan Ed. Co.(Three Mile Island 1)
Docket No. or License No.
50-289 Title
'CDR Evaluation and Followup CDR Date Rec'd 5/6/7a Origin B.
FS&EB Branch Coordinator:
Bryan Dreher X
G. Gower Ellis Paulus li. D. Thornburg Cot:plet, ion Requested by C.
Action Requested of:
ADREMP M&PP03 EPB RPB ADC0 03 C3 TA3 00E Region I
Date Requested 5/15/74 co=piction Reques ted by Routine Reference Letter to D. F. Knuth from Mr. J. G. Miller dated 4/30/74 D.
Action Requested The Metropolitan Edison Company (Three Mile Island Unit No. ) CDR covering the erosion of the "B" makeup and purification recirculaticn orifice is being assigned to Region I for evaluation of the technical adequacy of the corrective action and the final resolution of tne deficiency.
E.
Date Action Co=pleted Close-out (Date & Method)
Co=:nents : If completion date is not concistent with your work schedule, please let us know.
1485 039
. ' 4]
\\,M b L
lJp. G. Davis, Deputy Director for Field Operations Directorate of Regulatory Operations
'. 4'Y 3 9102 e u Q
.