ML19262A322

From kanterella
Jump to navigation Jump to search
Action Control Form CDR 270 Re Request for Evaluation of Technical Adequacy of Corrective Action & Final Resolution of Deficiency Discovered in B Makeup & Purification Recirculation Orifice
ML19262A322
Person / Time
Site: Crane Constellation icon.png
Issue date: 05/15/1974
From: Jennifer Davis
US ATOMIC ENERGY COMMISSION (AEC)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19262A319 List:
References
CDR-270, NUDOCS 7910260649
Download: ML19262A322 (1)


Text

.

Tc:

J. P. C

! illy, R0:I FSLE3 ACTICN CONT 2CL FORM A.

Action Code CDP 1270 Na=e of Licensee and Facility Metropolitan Ed. Co.(Three Mile Island 1)

Docket No. or License No.

50-289 Title

'CDR Evaluation and Followup CDR Date Rec'd 5/6/7a Origin B.

FS&EB Branch Coordinator:

Bryan Dreher X

G. Gower Ellis Paulus li. D. Thornburg Cot:plet, ion Requested by C.

Action Requested of:

ADREMP M&PP03 EPB RPB ADC0 03 C3 TA3 00E Region I

Date Requested 5/15/74 co=piction Reques ted by Routine Reference Letter to D. F. Knuth from Mr. J. G. Miller dated 4/30/74 D.

Action Requested The Metropolitan Edison Company (Three Mile Island Unit No. ) CDR covering the erosion of the "B" makeup and purification recirculaticn orifice is being assigned to Region I for evaluation of the technical adequacy of the corrective action and the final resolution of tne deficiency.

E.

Date Action Co=pleted Close-out (Date & Method)

Co=:nents : If completion date is not concistent with your work schedule, please let us know.

1485 039

. ' 4]

\\,M b L

lJp. G. Davis, Deputy Director for Field Operations Directorate of Regulatory Operations

'. 4'Y 3 9102 e u Q

.