ML19262A249
| ML19262A249 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 09/15/1975 |
| From: | Arnold R METROPOLITAN EDISON CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE), Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19262A250 | List: |
| References | |
| GQL-1505, NUDOCS 7910260585 | |
| Download: ML19262A249 (2) | |
Text
-.. - -.
NRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM)
CONTROL NO:
9910 Fil,E:
FROM:Metroplican Edison Co.
DATE OF DOC DATE REC'D LTR TWX RPT OTHER Reading, PA
~~ -
R.C. Arnold 9-15 -75
-17 ',-
vvy TO:
ORIG CC OTHER SENT NRC PDR NRC 1-signed SENT LOCAL PDR
,~~
CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:
xxxx 50-289 DESCRIPTION:
ENCLOSURES:
~
Ler trans the following:
Non-Routine Report #75-5"on 9-4-75 concerntng unplanned release of radioactive material
~~
-;a Three Mile Island di FOR ACTION /INFORMATION 9-22-75 JGB BUTLER (L)
SCHWENCER (L) ZIEMANN (L)
REGAN (E)
M ID(L)
W/ Copies W/ Copies W/ Copies W/ Copies W/,j COPIES CLAR K (L)
STOLZ (L)
DICKER (E)
LEAR (L)
W/ Copies W/ Copies W/ Copies
'W/ Copies PARR (L)
VASSALLO (L)
KNIGHTON (E)
SPIES W/ Copies W/ Copies W/ Copies W/ Copies KNIEL (L)
PURPLE (L)
YOUNGB LOOD (E)
LPM W/ Copies W/ Copies W/ Copies W/ Lopies INTERNAL DISTRIBUTION Fi j TECH REVIEW DENTON LIC ASST A/T IND.
DR
,,4CHROEDER GRIMES OGC, ROOM P 506A.WIACCARY GAMMILL
.. DIGGS (L)
BRAITMAN H. GEARIN (L)
SALTZMAN GOSSICK/ STAFF KNIGHT KASTNER E. GOULBOURNE (L)
MELTZ CASE PAWLICKl BALLARD P. KREUTZER (E)
GIAMBUSSO SHAO SPANG l.E R J. LEE (L)
PLANS BOYD STELLO M. RU3HER00K(L)
MCDONALD MOORE (L)
HOUSTON ENVIRO S. REED (E)
CHAPMAN DEYOUNG (L)
AOVAK MULLER M. SERVICE (L)
DUBE (Ltr)
SKOVHOLT (L)
/ OSS DICKER S. SHEPPARD (L)
E. COUPE GOLLER (L) (Ltr)
.APPOLITO KNIGHTON M. SLATER (E)
PETERSON P. CO L LINS fTEDESCO YOUNGBLOOD H. SMITH (L)
HARTFIELD (2)
OENISE J. COLLINS REGAN S. TEETS (L)
-MLECK E R BEG OPR LAIN AS PROJECT LDR G. WILLI AMS (E)
EISENHUT
/ FILE & REGION (2)
BENAROYA V. WILSON (L)
WIGGINTON '
MIPC A OLLMER H A R LESS c v
- p. INGRAM (L)
- Q Q; glMy M. DUNCAN m N..,... _.p
, m c,. :. s_3 w.
- we ;m"AEXTERNN DTSTRIBUTION -
>,- w 6 N H 4 M z/'..L 4 6 8 g.
,,,P-LOCAL PDR Harrisburg, Pa r-TIC (ABERNATHY) (1)(2)(10) - NATIONAL LABS 1 - PDR-SAN /LA/NY
. i - NSIC (BUCHAfJAN) 1 - W. PENNINGTON, Rm E 201 GT 1 - BROOKH AVEN NAT LAB 1 - ASLB 1 - CONSU LTANTS 1 - G. ULRIKSON ORNL 1 - Newton Anderson NEWM ARK /B LUM E/AG B ABI AN
- ACRS seenemmHsENT fo J. k -
jf q4 ]Q
-7910260983-
-:m-
-.w
Y}122 y;;y;'J 7e,w are ma nocorss o
METROPOLITAN EDISON COMPANY DOST OFC3C2 BOX 542 2EAOINt PENNSYLVANI A 19603 TELEPHONE 215 - 929-3601 r-Sept ember 15, 1975 GQL 1505
, ' ~.. _
l i_G:"f -
- ?-
Q' j.:'
'Q 4
Director s)
- S -
'm >
Division of Reactor Licensing
~
gh './;
\\g]. -,N,, g 7 U.S. Nuclear Regulatory Commission Washington, D.C.
20555 I
Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sirs:
Docket No. 50-289 Operating License DPR-50 Nonroutine 10-Day Report 75-05 In accordance with Section 6.7.2.a.2 of the Technical Specifications for our Three Mile Island Nuclear Station Unit 1,10CFR20.403, and 20.405 enclosed please find Nonroutine 10-Day Report 75-05 that deals with an unplanned release of radioactive material which occurred on September 4, 1975.
We would like to point out that no member of the public and no station or contractor personnel received a radiation dose in excess of the limits stated in 10CFR20 as a result of the release. Further, none of the limits given in the Technical Specifications were exceeded.
We trus t that this submittal satisfies the reporting requirements referenced above and adequately answers any concerns you may have.
Sincerely,
/) rb R. C. ' Arnold Vice President RCA:CWS:cas
Enclosure:
Nonroutine 10-Day Report 75-05 cc:
Mr. J. P. O'Reilly, (U.S. NRC-Region 1) 9 ' ]
Ms. Margaret Reilly (PaDER)
File:
20.1.1/7.7.3.12.1 b
)
v
-