ML19262A243
| ML19262A243 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 04/02/1975 |
| From: | Arnold R METROPOLITAN EDISON CO. |
| To: | |
| References | |
| 75-03, GQL-0889, GQL-889, NUDOCS 7910260580 | |
| Download: ML19262A243 (2) | |
Text
NRC "'5TRIEUTION FOR PART 50 DOCKE7 M ATERI AL (TEMPORARY FORM)
CONTROL NO 8E-FlLE: If; CIDE'E PEPC?T
1 FROM: Metropolitan Edison Co.
DATE OF DOC D ATE R EC'O LTR TWX RPT OTHER Reading, Pa.
F.C.
Ami d 4-2 79 4 4 74 vv TO:
ORIG CC OTHER SENT AEC PDR v--
A. Giambusso 1 Signed SENT LOCAL PDR D'X CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:
XXX 1
50-289 DESCRIPTION:
ENCLOSURES:
Ltr. reprt. Abnorm. Occurr. # 75-03, cor.cern-ing Secondary System Safety Valve exhaust pipe suppc r t sys tem...
,../
~~
( 1 cy. ltr. rec'd)
PLANT NAME:
Three Mile Island #1 FOR ACTION /INFORMATION VCR 4-10-75 BUTLER (L)
SCHWENCE R (L) ZIEMANN (L)
REG AN (E)
W/ Copies W/ Copies W/ Copies W/ Copies CLARK (L)
STOLZ (L)
DICKER (E)
/LE AR (L) w/ rnpiet W/ Copies W/ Conies
/
Wl.aton.es PARR (L)
VASSALL O (L)
KNIGHTON (E)
SPELS W/ Cnnies W/ Copies W/ Cocies W/ Copies KNIEL (L)
PURPLE (L)
YOUNGSLOOD (E)
W/ Copics
.W/ Copies W/ Copies W/ Copies INTERNAL DISTRISUTION 5GF':
TECH REVIEW DENTON LIC ASST A/T IND -
~ PRIMES R. DIGGS (L)
_B R AITi.. AN s
f OGC. ROOM P 50GA MACCARY GAMMILL H. GE ARIN (L)
SALTZi.*AN GOSSICK/STAF F KNIGHT KASTN E R E. GOULSOURNE (L)
MELTZ
- j. CASE PAWLICKI BALLARD P. KREUTZER (E)
GI AM BUSSO SHAO SPANG LER J. LEE (L)
PLANS BOYD
MCDONnLD MOORE (L)
- f.HO USTO N ENVIRO S. REED (E)
CHAPMAN
,.NOVAK MULLER M. SERVICE (L)
DUBE (Lt.-)
DEYOUNG (L)
SKO.VHOLT (L)
ROSS DICKER S. SHEPP ARD (L)
E. COUP E GOLLER (L) (Ltr) lPPOLITO KN GHTON M. SLATER (E)
PETERSON f
f P. CO L LIN S TEDESCO YOUNG BLOOD H. SMITH (L)
HARTFIELO (2)
DENISE LONG REGAN S. TEETS (L)
KLECKER REG OPR LAIN AS PROJECT LDR G. WILLI AMS (E)
EISENHUT
/ FILE & REGION (2)
BENAROYA V. WILSON (L)
WIGGINTON
-pT.R. WI LSON(::)
VOLLMER HAR LE SS R. INGRAM (L)
- F. i;ILLI!:'S STEELE urm r e EXTERN AL DISTRIBUTION Mdf E-I el - LOCAL POR-
- srrf ebur2)(10) - NATION AL LABS Pa.
/ - TIC (ASERN AT HY) (1)f 1 - PDR S AN/LA/NY 1
1 - NSIC (BUCHAN AN).
1 - W. PENNINGTON, Rm E-201 GT 1 - BROOKH AVET. N AT LAS f
1 - G. U L RI KSO'.L O r:N '.
1 - ASLB 1 - CONSU LT/sNTS 1, -- New ton Anderson N EWM AR K/ S LL".1E/AG B ASI AN 1 - AGME D (RUTH GUSS. ~.AN' i
Rm B-127 GT M - ACRS SE;; TG LIC t.SST 1 - J. D. R UNK L E'S. E r. E 20 '
1464 22-3 GT
- SE:D C:7 Y TE:' D!3.EPC.T 5 2 910 260 M O J
27X
- ,y.
ma a mangss U
METROPOLITAN EDISON COMPANY Po3T OFFICE Box 542 RE ADING. PENNSYLVANI A 19603 TELEPHONE 215 - 929-3601 April 2, 1975 GQL 0339 Mr. A. Gia busso, Directer Division of Reactor Licensing U. S. I?uclear Regulatory Cornissicn
'v ashington, D.C.
20555 Fr. J. P. O'Reilly Office of Inspection & Enforcement, Region 1 -
631 Park Avenue Eing of Prussia, Pennsylvania
Dear Sirs:
Operating License DPE-50 Docket No. 50-289 Three File Island Nuclear Station, Unit 1 (T!C-1)
Non-Routine 30 Day Report 75-03
'"he purpose of this letter is to infor: you of a situation that exists at T:C-1 which =ay be considered to be reportable in accordance with the TIC-1 Technical Specifications, Section 6.7.2.b. The situation cencerns the secondary syster safety valve exhaust pipe suppert syste=,
and the fact that gaps occassionally develop between the bearing plates of the pipe suppcrt stanchiens.
As a reedt of preliminary investigatiens it has been determined that airinistrative centrols have been, and vill continue to be, adequate to keep adjustment of the gap to within acceptable safe limits. Please aise be informed, however, the.t we intend to further investigate this situatict and to provide you vith a more detailed report by May 2,1975 Sincerely, 1
G,, ;
/ *
-l s
U E. C."fM.old Vice President ECA:D::G:tas File:
20.1.1 / T. '. 3. 6.1 W
e eup 1484 226