I r
/
//27:2 v 5 " -,..
METROPOLITAN EDISON COMPANY sus.can cicuem rueucuriurrasconocr>riov
/
POST OFrtCE DOX 400 MiO O LETOW N. PENNSYLV ANI A 170G7 TELEPHONE 717 944.4041 Apr'll 7,1975 Uh7?
Mr. J.P. O'Reilly, Director Directorate of Regulatory uf ff e
Regicn I
~
631 Park Aveaue Xing of Prussia, Pa.
19406 Operating License DPR 50 Docket 50-289_
Subject:
Abnorraal Occurrence No. A0 75-09
Dear Mr. O'Reilly:
This telegram is to confinn the telecon with Mr. I.ee Spessard (Region I-CiiO),
and J.J. Colitz (TMI-Unit i Superintendent) at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> 6 April 1975.
The following report is submitted in accordance with paragraph 6.7.2.4.4 (page 6-11) of the technical specifications.
During a routine inspection of the Reactor Building, one snubber, installed at RI-110 (Feedwater to A OTSG, Inside Secondary Shield) was found to be inoperative due to a loss of fluid.
The unit was replaced with a rebuilt, tested unit of the same size and stroke.
In addi tion three other units (located at B1-109 Bl-ll4, and Ri-115) were found to have BH-1226 type snutber valves. (See A0 75 08) These units were reolaced by rebuilt tested units of the sat e size and stroke.
A completo inspection of all other snubbers witnin the secondary shield folicwed the telecon between Lee Spessard and J.J. Colitz and no otner Lindco cylinders
\\
with BH-1226 valves went found to exist within the secondary shield. Durtng tnis follow-up inspection, two snubbers installed at RC-13 and RC-23 (Pressurizer Spray Line) were found to have no oil showing in the signt glass. Both of these snubbers are Basic Engineers units, 3/4' bore, 5" stroke. Botn of these units are in the process of being rebuilt and replaced.
Very truly yours,
j l
J. G. ite rtse.,
1 4
0e3 st1/de:n
~ S ta *.io, Superin tendent f
'91026
7 3
.m i
Mark Hurter Location Malfunction Corrective Action Descriptica
\\
FW-110 A feedwater line inside Loss of fluid Replaced with rebuilt unit of Bore 2 1/2" Secondary Shield (El sa m size and strcke.
Stroke 5" 341).
Mfgr: Grir.r.c11 Cylinder: Lindco Valve: 1226 FW-109 A feedwater line Inside Failure to lockup within Replaced with rebLilt unit of Bore 2 1/2" g
Seconcary Shield (El acceptable range.
sa:ne size and strcke.
Stroke 5" 341).
Mfgr: Grinnell Cylinder: Lindco Vaive: 1226 FW-114 8 feedwater line Inside failure to lockup withi.-
Replaced with rebuilt unit of Bore 21/2" Secondary Shield (El the acceptable range.
same size ar.d stroke.
Stroke 5" 325).
Mfgr: Grinnell Cylinder: Lindco Valve: 1226 FW-115 B feedwater line inside Failure to lockup within Replaced with rebuilt unit of Bore 2 1/2" SecondaryShield(El the acceptable range.
sa:ne size and stroke.
Stroke 5" W
325).
Mfgr: Grinnell Cylinder: Lindco Valve: 1226 CD
-4=
TV CD Ch s