ML19262A189
| ML19262A189 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 01/03/1975 |
| From: | Herbein J METROPOLITAN EDISON CO. |
| To: | |
| References | |
| NUDOCS 7910260518 | |
| Download: ML19262A189 (2) | |
Text
AECC-JR JT:O*: FOR P' RT S0 CCCKET J ll AL (T E:/ F C.M R Y F O R.~.:)
CONTROL NO:
2D FILE: INCIDENT E W "'
FRO:.*:
"et. Edison Cenpany DATE OF CCC D ATE R EC'D LTR T'/,'X ' RP T OTHER Lebanen, Ps.
170h2 o
J. . Wrbein 1
1-3-75 1-13-75
'CC TO:
- C(
"r J.P. O'Nilly 1
SENT LCCAL POR CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKETNO:
50-280
- CC(
1 ENCLOSURES:
DESCRi? TION' Ltr adv of Abnornal Cccurrence A0-7502 on 1-3-75 re the 13 Eeactor Ildg.
E=egency Cooling River Water Du=p(ER-P-13) failed to start cn signal...
D * "'D 701 f
?
I d
Ulj oe u
i o
PLANT NAME:
Three Mile Island Unit 1 FOR ACTlOT:lU:FO RT.' AT 0[!_
CHL l-13-75 _ _ _ _ _
BUTLER (S)
SCHWENCER (S)
ZIEMAND (S)
REGAN (E)
W/ Copics W/ Copies W/ Copies
,tg Copies CLARK (S)
STOLZ (S)
DICKER (E)
- LE (S)
W/ Ccpies W/ Copies W/ Copies W/ Copics PARR (S)
VASSALID (S)
KNIGHTON (E)
SPEIS (S)
W/ Copies W/ Copies W/ Copies W/ Copies
/
KNIEL (S)
PURP12 (S)
YOUNGBLOOD (E)
W/ Copies W/ Copies W/ Cooies W/ Copies INTER :AL DISTR:CUTIC J F "C FILE 7 TECH REVIEW DE!'r0N LIC. ASST.
A/T ITD VAEC PDR MCHROEDER GRIMES DIGGS (S)
BRAIT1921 4GC, ROCM P-506-A N'ACCARRY GA>0!ILL GEARIN (S)
SALTZMAN NCNIZING/ STAFF
/Ci1CHT
/KASTNER GOULBOURNE (S)
B. HURT LDASE d3AWLICKI BALLARD KREUTZER (E)
GIN!BUSSO t$HAD SPANGLER LEE (S)
PLANS BOYD EDTELIO MAIGRET (S)
ECDONALD MOORE (S) (BWR)
- riOUSTON ENVIRO REED (E)
CHAPMAN DEYOUNG (S) (PWR) d;0VAK MULLER SERVICE (S)
DUBE w/ input SKOVHOLT (S)
DOSS DICKER SHEPPARD (S)
E. COUPZ COLLER (S)
IIPPOLITO ICTIGEION SLATER (E)
VD. THOMPSON (2)
P. COLLINS TEDESCO YOUNGBLCOD
_ JMITH (S)
YKLECEER DENISE
/ANG REGAN VrEETS (S)
/F. WILLIE'3 REG OPR (AINAS PROJECT LDR WILLIAMS (E)
M'ILE & REGION 43ENAROYA WILSON (S) f.R. WILSON STEELE YVOLIMER HARLESS INGRAM (S)
EXi E P': ALDIST::EU T!O N' uf u eft-LCCAL PDR M rrisbur~. Ps.
(1)(2)(10)-PATIONAL LA35 1-PDR SNT/LA/:Tl M1-TIC ( A3ERSATHY) 1-H. PENNINGTON, RM E-201 G.T.
1-BRCCKHAVEN ::AI LA3 d-NSIC(3UCHXIMI) 1-CONSULTR'IS 1-G. UUIKSCU, OR:.'.
1 AGFED(RUIH GUSS m >
1-ASLB NEWMARK/BLUME/ASBASIAN
} h b RM B-W G.T.
l-NEWr0N ANDERSON h5-ACRS SE:!I 10 LIC. ASST.
}
l-J. RU: TALES, R:: I-2E S. Teets 1-13 G.T.
1910 2 g p 5p 3
[#
Md METROPOUTAN EDISON COMPANY suostmonvorocuran eucucuvuursconronanon TELEPHONE 7t? - 272 660s CFPICE BOX 240 LEDANON, Pf M80$YLVANIA 17042 January 3.1975 g.
j%
...;<iz)
Mr. J.P. O'Reilly, Director
.~
~
Directorate of Regulatory DV Region I 631 Park Avenue King of Prussia Pa.
19406 Operating License DPR-50 Docket 50-289
Subject:
Abnormal Occurrence No A0 75-02 ma c
c7
Dear Mr. O'Reilly:
ao This teleDram is to confirra the telecon betwun Lee Spessard Region I-AEC, and J.G. Herbein (TMI-Station Superintendent) at 1630 hours0.0189 days <br />0.453 hours <br />0.0027 weeks <br />6.20215e-4 months <br /> 3 January 1975.
The folicwing report is subciitted in accordance with paragraph 6.7.2.a.4 (page 6-11) of the technical specifications.
Un 3 January, while conducting high and low pressure in,iection surveillance testing, the IB Reactor Building Emergency Cooling? River Water Pump (RbP'-18) failed to start on signal.
The 1A Reactor Building Emergency Cooling River Water Pump was satisfactorily tasted to verify operability.
Investigation into the cause of the RR-P-18 start failure indicated the motor circuit breaker failed to close on signal.
The PR-P-la was subsequently satisfactorily tested again on the logic co.+.
bination that the start failure previously occurred.
A further investigation will be conducted to determine the cau;e of RR-P-1B start failure.
The circuit breaker idiich failed to close was 4XV Westinghouse 50DHP350 breaker.
Very truly yours,
/JQs/p>\\482\\96 s/
2a
.G. Hee ein Station Superintendent