Abnormal Occurrence 75-02:on 750103,during High & Low Pressure Injection Surveillance testing,1B Reactor Bldg Emergency Cooling River Water Pump Failed to Start on Signal.Caused by Circuit Breaker Failure
ML19262A189
Person / Time
Site: Crane Constellation icon.png
Issue date: 01/03/1975
From: Herbein J
METROPOLITAN EDISON CO.
To:
References
NUDOCS 7910260518
Download: ML19262A189 (2)


Text

AECC-JR JT:O*: FOR P' RT S0 CCCKET J ll AL (T E:/ F C.M R Y F O R.~.:)

CONTROL NO:

2D FILE: INCIDENT E W "'

FRO:.*:

"et. Edison Cenpany DATE OF CCC D ATE R EC'D LTR T'/,'X ' RP T OTHER Lebanen, Ps.

170h2 o

J. . Wrbein 1

1-3-75 1-13-75

'CC TO:

ORIG CC OTHER SENT AEC PCR

C(

"r J.P. O'Nilly 1

SENT LCCAL POR CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKETNO:

50-280

CC(

1 ENCLOSURES:

DESCRi? TION' Ltr adv of Abnornal Cccurrence A0-7502 on 1-3-75 re the 13 Eeactor Ildg.

E=egency Cooling River Water Du=p(ER-P-13) failed to start cn signal...

D * "'D 701 f

?

I d

Ulj oe u

i o

PLANT NAME:

Three Mile Island Unit 1 FOR ACTlOT:lU:FO RT.' AT 0[!_

CHL l-13-75 _ _ _ _ _

BUTLER (S)

SCHWENCER (S)

ZIEMAND (S)

REGAN (E)

W/ Copics W/ Copies W/ Copies

,tg Copies CLARK (S)

STOLZ (S)

DICKER (E)

  • LE (S)

W/ Ccpies W/ Copies W/ Copies W/ Copics PARR (S)

VASSALID (S)

KNIGHTON (E)

SPEIS (S)

W/ Copies W/ Copies W/ Copies W/ Copies

/

KNIEL (S)

PURP12 (S)

YOUNGBLOOD (E)

W/ Copies W/ Copies W/ Cooies W/ Copies INTER :AL DISTR:CUTIC J F "C FILE 7 TECH REVIEW DE!'r0N LIC. ASST.

A/T ITD VAEC PDR MCHROEDER GRIMES DIGGS (S)

BRAIT1921 4GC, ROCM P-506-A N'ACCARRY GA>0!ILL GEARIN (S)

SALTZMAN NCNIZING/ STAFF

/Ci1CHT

/KASTNER GOULBOURNE (S)

B. HURT LDASE d3AWLICKI BALLARD KREUTZER (E)

GIN!BUSSO t$HAD SPANGLER LEE (S)

PLANS BOYD EDTELIO MAIGRET (S)

ECDONALD MOORE (S) (BWR)

  1. riOUSTON ENVIRO REED (E)

CHAPMAN DEYOUNG (S) (PWR) d;0VAK MULLER SERVICE (S)

DUBE w/ input SKOVHOLT (S)

DOSS DICKER SHEPPARD (S)

E. COUPZ COLLER (S)

IIPPOLITO ICTIGEION SLATER (E)

VD. THOMPSON (2)

P. COLLINS TEDESCO YOUNGBLCOD

_ JMITH (S)

YKLECEER DENISE

/ANG REGAN VrEETS (S)

/F. WILLIE'3 REG OPR (AINAS PROJECT LDR WILLIAMS (E)

M'ILE & REGION 43ENAROYA WILSON (S) f.R. WILSON STEELE YVOLIMER HARLESS INGRAM (S)

EXi E P': ALDIST::EU T!O N' uf u eft-LCCAL PDR M rrisbur~. Ps.

(1)(2)(10)-PATIONAL LA35 1-PDR SNT/LA/:Tl M1-TIC ( A3ERSATHY) 1-H. PENNINGTON, RM E-201 G.T.

1-BRCCKHAVEN ::AI LA3 d-NSIC(3UCHXIMI) 1-CONSULTR'IS 1-G. UUIKSCU, OR:.'.

1 AGFED(RUIH GUSS m >

1-ASLB NEWMARK/BLUME/ASBASIAN

} h b RM B-W G.T.

l-NEWr0N ANDERSON h5-ACRS SE:!I 10 LIC. ASST.

}

l-J. RU: TALES, R:: I-2E S. Teets 1-13 G.T.

1910 2 g p 5p 3

[#

Md METROPOUTAN EDISON COMPANY suostmonvorocuran eucucuvuursconronanon TELEPHONE 7t? - 272 660s CFPICE BOX 240 LEDANON, Pf M80$YLVANIA 17042 January 3.1975 g.

j%

...;<iz)

Mr. J.P. O'Reilly, Director

.~

~

Directorate of Regulatory DV Region I 631 Park Avenue King of Prussia Pa.

19406 Operating License DPR-50 Docket 50-289

Subject:

Abnormal Occurrence No A0 75-02 ma c

c7

Dear Mr. O'Reilly:

ao This teleDram is to confirra the telecon betwun Lee Spessard Region I-AEC, and J.G. Herbein (TMI-Station Superintendent) at 1630 hours0.0189 days <br />0.453 hours <br />0.0027 weeks <br />6.20215e-4 months <br /> 3 January 1975.

The folicwing report is subciitted in accordance with paragraph 6.7.2.a.4 (page 6-11) of the technical specifications.

Un 3 January, while conducting high and low pressure in,iection surveillance testing, the IB Reactor Building Emergency Cooling? River Water Pump (RbP'-18) failed to start on signal.

The 1A Reactor Building Emergency Cooling River Water Pump was satisfactorily tasted to verify operability.

Investigation into the cause of the RR-P-18 start failure indicated the motor circuit breaker failed to close on signal.

The PR-P-la was subsequently satisfactorily tested again on the logic co.+.

bination that the start failure previously occurred.

A further investigation will be conducted to determine the cau;e of RR-P-1B start failure.

The circuit breaker idiich failed to close was 4XV Westinghouse 50DHP350 breaker.

Very truly yours,

/JQs/p>\\482\\96 s/

2a

.G. Hee ein Station Superintendent