ML19262A177

From kanterella
Jump to navigation Jump to search
Abnormal Occurrence 74-15:on 740911,reactor Bldg Spray Valve BS-V1B Failed to Open.Caused by Wiring Error in Engineered Safeguards Actuation Logic Output Which Resulted in Blown Control Fuse.Wiring Error corrected,BS-V1B Test Successful
ML19262A177
Person / Time
Site: Crane 
Issue date: 09/13/1974
From: Herbein J
METROPOLITAN EDISON CO.
To:
References
NUDOCS 7910260503
Download: ML19262A177 (1)


Text

METRO?OUTAN EDISC* COMPANY sussimmorcrusut,ucununtsccoonno

/

TELEPHONE 717-

/

ST OFFICE BOX 480 MIDDLETOWN. PENNSYLVANIA 17057 Septeeber 13, 1974

]D*'PlD f6 J s L A\\ d [R 7 0 "\\dM Mr. J.P. O'Reilly, Director Directorate Of Regulatory Region I 631 Park Avenue

. King Of Prussia Pa.

19406 Operating nse DPR-50 Docket 50f269

Subject:

Abnomal Occurrence Ho. A0 74-15

Dear Mr. C'Reilly:

This telegram is to confim the telecon betxeen Mr. Burt Davis (Region I-AEC),

and J.G. Herbein (TMI-Station Superintendent) at 2000 hrs.12 Septecer 1974.

The following report is sub:ritted in accordance with paree aph 6.7.2.a (page

(-11) of the technical specifications.

On 11 Septer:ter while perfcrming Quarterly Surveillance Procedure 1303-5.1,

" Reactor Building Cooling and Isolation Syste::: Logic Channel and Co,.ponent Te3t," Reactor Building Spray Valve, BS-V1B failed to open as the result of a bics:n control fuse.

The failure occurred while testing the Engineered Safeguards two out of three, 4 psig, logic channels.

The duplicate (redundant) cocponent (BS-V1A) was tested and proved to be operable.

The investigation subsequently revealed a wiring error in the Engineered Safeguards Actuation logic output to BS-V1B. The wirir,g error connected the logic contacts of 65-VlB with a DC circuit. The wiring error was sub-sequently corrected a.,d BS4V1B was successfully tested.

Very truly yours,

/

J.G. Herbein Station Superintendent

'l,

THI Nuclear Station hen

<(

JGi/ct::n fdO M 3 3

.'if 910 1482 153