ML19262A033

From kanterella
Jump to navigation Jump to search
Requests Extension Until 791015 to Revise QA Program Description
ML19262A033
Person / Time
Site: 07100258
Issue date: 10/02/1979
From: Eason C
U.S. ECOLOGY, INC. (FORMERLY NUCLEAR ENGINEERING
To: Macdonald C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
14325, NUDOCS 7910260170
Download: ML19262A033 (1)


Text

....

ic/

P;R fN7t-carr xuciear Engineering company;1nc.

g'] g Iloo 17TH STREET N. W.,

loth rLooR, SUITE loco WAsHlNGToN, D. C. 2co36. PHON E(202) 785-47o5 October 2, 1979 v-g Mr. Charles E. MacDonald, Chief OC Transportation Certification Branch H

09fg2 Division of Fuel Cycle and Material 15 8A 9 Safety, NMSS M

Nuclear Regulatory Commission 4

g Washington, D.C. 20555 5

Q Re:

Docket No. _71-0258

Dear Mr. MacDonald:

This is in reply to your letter of September 5, 1979, to the attention of Dr. Thomas S. Baer, in which you request we revise our QA program description to address various aspects of the acceptance criteria used to evaluate such programs.

Although we have been diligently endeavoring to comply with'your request that we respond within 30 days,-it appears that it vill require approximately two additional weeks to adequately address all those points raised in your letter.

We trust that you will find this additional period of time to be acceptable.

If we do not hear from you to the contrary, we will plan to submit our revised QA program de-scription on or before October 15, 1979.

Sincerely, Nuclea n ineering Company, Inc.

Y' c

~ g Charles F.

Eason, Jr.

Office of Governmental Affairs OGA 79-405 1215 181 1 3%S 7910260;7o C__