Forwards Response to IE Bulletin 77-05 Re Failure of Pin & Socket Type Electrical Connectors in post-LOCA Containment Environ.Facility Does Not Use & Does Not Plan to Use Assemblies of Type Tested by Sandia Lab
ML19261F369
Person / Time
Site: Crane Constellation icon.png
Issue date: 12/08/1977
From: Herbein J
METROPOLITAN EDISON CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
GQL-1699, NUDOCS 7910250833
Download: ML19261F369 (3)


Text

Cb7Ai+Lfist

/

i l*

WM/f2;'l.]

w, n.,

/

e

/

n,

- x m

/

METROPOLITAN EDISON COMPANY sussiouavorce::sen vueucunuriesccarcuric::

F3T OFFICE BOX 542 READING, PENNSYLVANI A 19603 TELEPHONE 215 - 929-3601 December 8, 1977 GQL 1699 Mr. B. H. Grier, Director U. S. Nuclear Regulatory Commission Region 1 631 Park Avenue King of Prussia, Pennsylvania 19hc6

Dear Sir:

Three Mile Islar.d Nuclear Station Unit 1, TMI-l Response to IE Bulletin No. 77-05 Enclosed please find Metropolitan Edison's response to I.E. Bulletin No. 77-05 concerning the failure of pin and socket type electrical connectors in a post LOCA containment environment.

In light of the fact that the supplement to I.E.Bulletin 77-05 (I.E.

Bulletin 77-05A) was received by Met-Ed on November 16, 1977, and because additional analysis is required to formulate a response to that supple-ment, Met-Ed vill respond to I.E. Bulletin 77-05A by December 16., 1977 We trust this submittal to be satisfactory,- however, should you have any additional questions please contact me.

Sincerely(

s

/

J.

Nerbein Vice President JGH:RAL:tas Enclosure ec:

U. S. Nuclear Regulatory Ccmmission Office of Inspection and Enforcement Division of Reacter Ccnstruction Inspecticn Washington, D,C.

20555 1482l23 M

m osso w

Encl re to GQL 1699 Metropolitan Edison Company Three Mile Island Nuclear Station, Unit 1 I.E. Bulletin No. 77-05 Recent tests conducted by Sandia Laboratories of electrical connector / cable l

assemblies in a simulated post LOCA containment environment (LWR) demonstrated l

1 that the assemblies failed to perform in an acceptable manner. Metropolitan i

Edison Generation Engineering has reviewed the TMI-1 safety systems which cre located within containment, and therefore could be subjected to a post LOCA containment environment. These systems are as follows:

I.

Engineered Saferuards Actuated Eauinment AH-E-1A/B/C NS-V-35 IC-V2 AH-VlB/C MU-V2A/B l

MU-V25 CF-V2A/B CA-V1,3,hA/B, 13 WDL-V303 II.

Reactor Protection Systems A.

Neutron Detectors B.

Reactor Coolant Pressure Transmitters C.

Reactor Outlet Temperature RTD's D.

Potential and Current Transformers for Reactor C.colant Pump Pcver Monitors E.

Reactor Coolant Flov Elements

~

III.

Enrineered Safeguards Actuation Instrumentation A.

Reactor Ccolant Pressure Transmitters n

The connecters which were tested by Sandia Laboratories, and found to be deficient ve:e of the pin and socket type,' with metal shell and screw couplings. TMI-1 does not use any pin / socket connectors for any pcVer cr -control cable connections. These _

connections are made by "hard viring" (i.e. terminal biceks, which are inside either 1

2 motor terminal boxes or GAI terminal boxes)'.

Of the safety systems listed above, pin and socket type connectors are used enly in the control rod drive mechanis:s (CREM) and in the neutron detectors. Neither the CREM nor the neutron detectors are required to operate during a LOCA.

The CRDM vill trip upon loss of pcVer initiated by a reactor trip.

It should be noted, that should a CRDM fail, it vill fail with the control rod in the safe (" inserted")

l position. Additionally, a failure of a connector en a control rod positien indicato.

vould produce a false reading which would initiate a non-safety related alarm indication.

Neutron detectors are not required to cperate during a LOCA. These detectors provide input to the Reactor Protection Syste=, as a safety system, during operaticn.

It should also be noted that the electrical connectors used in conjuncticn with these neutron detectors are manufactured by a different company than those which were tested by Sandia Labcratories.

Met-Ed therefore concludes that T'4I-1 does not utilize or plan to utilize electrical r:ennector assemblies of. the type tested by Sandia Laboratories, or any other similar (pin and socket) type, in syste=s that are located inside containment, are subject to a LCCA environ =ent and are required to be operable during a LOCA.

1482 125

.