ML19261F359
| ML19261F359 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 08/20/1976 |
| From: | Arnold R METROPOLITAN EDISON CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| GQL-1195, NUDOCS 7910250821 | |
| Download: ML19261F359 (1) | |
Text
_
. _ _ _ _. _[b.i':<//b:i J4 m -?,i"~ y
/
c
,i uCC,:,:,,
me na ~xnss METROPOLITAN EDISON COMPANY m.m.* c oc r u awavnure :< omm.tre POST CFF!CE BOX 542 RE ADING, PENNSYLVANI A 19G03 TELEPliCNE 215 - 9290C01 August 20, 1976 GQL 1195 Mr. J. P. O'Reilly, Director Office of Inspt:ction ', Enforce =ent, Region I.
U.S. Nuclear Regulatory Cc =ission 631 Park Avenue King of Prussia, Pennsylvania 19hC6
Dear Sir:
Three Mile Island :iuclear Statica Unit 1 (TMI-1)
Docket No. 50-289 Operating License No. EPR-50 IE Eulletin 76-07 Met-Ed has not =ade nor do we plan to make any modifications to the hoist, controls for the installed cranes at TMI-l si=ilar to tnose described in your IE bulletin 76-07. Although no such modifications have been made, the main hoist en the Reactor Building Crane has two motors and therefore does have a bre.e contactor. Therefore, prior to the next Reacter Head Re= oval, Met-Ed vill:
1.
Verify that the brake centactor is rated for h80V AC and is sized for the current drawn by the brake.
2.
Inspect the brake contactor for the Reactor Building Crane main hoist.
Sincerely, R. C.
rnold RCA:JJM:=ft Vice President
/
l e
1482 105 7910250 7o