Responds to IE Bulletin 78-05 Re Malfunctioning GE Model CR 1054 Circuit Breaker Auxiliary Contact Mechanisms. Auxiliary Switches Will Be Replaced W/Improved Switches
ML19261F355
Person / Time
Site: Crane Constellation icon.png
Issue date: 05/19/1978
From: Herbein J
METROPOLITAN EDISON CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
GQL-0967, GQL-967, NUDOCS 7910250817
Download: ML19261F355 (1)


Text

.

j--

- c p r,t r s us s-N272

'T9 MU OOPOLITAN EDISON COMPANY sueswm or cer;;m pucucununn ewan.c. /

iT OFFICE BOX 542 RE ADING. PENNSYLVAh A 19603 TELEPHONE 315 - 929 3001 May 19, 1978 GQL 0967 a. 3. H. Grier, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Cc ission 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Sir:

Three Mil - Island Nuclear Staticn Unit I ('NI-1)

.perating License No A. " 50 Docket,No.JHT-28o IE Bulletin "^

-5 This letter is in response to IE Bulletin No. 78-05 ccncerning the =alfunctioning of General Electric model CR 105h circuit breaker auxiliary contact =echanisms.

The controls for st.fety-related equipment have been reviewed for use of GE Series 100 Contactors with auxiliary contacts, It was deter =ined that series 100 contactors with auxiliary contacts are used for the DC fuel oil Transfer Pumps of the Emergency Diesel Generators. The DC Pu=p is a backup to the AC pump and no probler ave been experienced with the contactor operation. The auxiliary switchrs vill be replaced when the l= proved switches 're received frc= the ranufacturer.

The expected cc=pletion date is October 31, 1978.

Sincerely,

. G. Herbein Vice President-Generation JGH:DGM:cjg cc: Office of Inspection and Enforce =ent Division of Reactors Operations Inspection U.S. Nuclear Regulatory Cc==ission