RO 77-18/31:on 770629,Nuclear Svcs River Water Pump NR-P1C Shaft Failed While Operating,Leading to Operation in Degraded Mode.Caused by Mechanical & Procedural Problems. Pump Overhauled,Preventive Maint Procedures to Be Changed
ML19261F322
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 07/27/1977
From: Herbein J
METROPOLITAN EDISON CO.
To:
Shared Package
ML19261F323 List:
References
NUDOCS 7910250783
Download: ML19261F322 (4)


Text

.

NRC poRu 195 U.S. NUCLE AR REcutAroRy s.uusssioN CoCKET NUMBE R t2 76) [O == d h NRC DISTRIBUTION PoR PART 50 DOCKET MATERi/ L INCITJENT nEPOPT FROM: CATE oF OCCL MENT l TO:

Metropolitan Edison Company 7/27/'i7 g Mr. B. H. Orier Reading, Pa. DATE RECEtVEC J. G. Herbein 8/3/77

'ETTER C NCToml2E O PRCP INPUT poRM NUMBER oF COPitS RECE1VEC

' RIG 4N AL yNC L43lp t g p c c" 1 S o'n N eb OESCRIPTloN ENCLOSURE r.... Licensee Event Report (R0 50 289/77-18/3L) s ..

'" on 6/29/77 concerning Nuclear Services river

~ ' " '

water pump shaft failing.....

-, ~}

g'g;u.an-- ' -

PLANT NAME:

Three Mile Island Unit No. 1 RJL 8/3/77 (3.P) (1-P)

NOTE: IF PERSONNEL EXPOSURE IS INVOLVED SEND DIRECTLY TO KREGER/J. COLLINS

/ cy 6NcA frec*J

_ . FOR ACTION /INFORMATION l no 3*!rti f*nte r

  • U G Gd I gr / 7 cyq rop i t*
  • T n *1 l 1 Tt' ACRT_*  ? _^* rA_4YkN-l I

I i I r T INTERNAL DISTRIBUTION

(( 7en eTTe ]

l ~ ,, - -

I - r- r rn t l l l sf

  • er l i 1 I I =cunnr7en /I?POLITO l I uc r +c +mi l i l l *invs z /rurry l l * '? Ts.fT q l l esi e c u,- 1 I i

,-.r, i i u s r 3 tern I

  • r9fCFO 73eQ l I

< win vnt,v n19tn:rn i l I i j Yorf*73 / _f COTTTNS l l 3091 l l l 1 1 I i l , , ,

EXTERN AL DISTRIBUTICN CONTROL NUMBER t i . .,. ua n ea su r. ro. i t - C.

s.e .g . I I .1 482 04 4 I ACRS (16) SENT AS dATL B h

, I l 774150.,# -* * '

{!

I l l 1 NRCFoRM 195(2 76) 7910250 3

i .

Wq:fra '

m, n .. ,. nu a ~wan METROPOLITAN EDISON COMPANY _

POST OFFICE BOX 542 REACING. PENNSYLVANIA 19603 TELEPHONE 215 - 929-0601 July 27, 1977 __s GQL 0978 , i. ;r

<.i'.E

/*

da, -

IUf ~.

~, .-

jffh , f IS77 5 AprN 4_

Mr. B. H. Grier, Director [V t =.8 c.

U 4 4 .e 7

Office of Inspections and F.nforcement, Region 1  ?.

U. S. Nuclear Regulatory Commission - ___- 9 631 Park Avenue UX King of Prussia, Pennsylvania 19hc6

Dear Sir:

Docket No. 50-289 Operating Licence No. EPR-50 In accordance with the Technical Specifications of our Three Mile Island Nuclear Station LMit 1 (TMI-1), we are reporting the following reportable ocu.rrence.

(1) Report Nunber: 77-18/3L (2a) Required Report Date: 7/29/77 (2b) Date of Occurrence: 6/29/77 (3) Facility: "'hree Mile Island Nuclear Statien - Unit 1 (h) Identification of Occurrence:

Title:

Nuclear Se vices River Water Pump Shaft failed.

Type: A reportable occurrence as defined by Technical Specification 6.9 2.3(2) in that Nuclear Services River Water Pump (NR-P1C) shaft failed while cperating thus letding to cperation in a degraded mode permitted by a limiting condition for operatien as defined b'y Technical Specificatica 3.3.2.

TAB 2 045

.u "f 16V"

Mr. 3. H. Grier, Director July 27, 1977 gal C978 (5) Ccnditions Prior to occurrence:

  • Pcwer: Cere: 2517 MWt Elec: 810 MWe, gross RC Flow: Ik5 x 100 lb/hr RC Fressure: 2168 psig RC Temp: 579 FRZR Level: 226 inches FRZR Temp: 6h8 F (6) Descriptian of Cecurrence:

An Auxiliary Operator, while performing routine preven _ve maintenance in the Intake Pump and Screan House, investigated an unusual noise. He discovered that the motor and pump coupling for USRW pump (NR-P1C) were rotating but that the pump shaft was not. Subsequent disassembly of the pump coupling revealed that the pump shaft had sheared. As all three (3) 3SRW pumps were crerating at the time, no effect en closed cooling water temperatures were observed. UR-Plc was selected for ES operatien at the time of failure.

(7) Apparent Cause of Occurrence:

The cause of this occurrence has been determined to be due to both mechanical and procedural problems. The pump shaft had shown increased pump shaft vibration levels ( 9 to lh mils) en routine weekly vibraticn readings since March 2h, 1977, and was scheduled by Maintenance to be the next pump for overhaul. The recc==endation to restrict operation of the pump until the overhaul could be cc=pleted was never effectively ccmmunicated to the Operaticn Department and the pump continued to be operated for at least three (3) weeks prior to its failure.

Lack of precedural requirements to insure proper repcrting of degraded equipment conditicns to the proper =anagement perscnnel was the major cause of this occurrence. Visual inspection of the failed pump shaft indicated cyclic fatigua as the mode of failure.

(3) Analysis of Occurrence:

It has been determinec that this occurrence did not constitute a threat to the health and safety of the public in that there was no increase in closed cooling water temperatures resulting frc= the failure, and no adverse effect en ncr=al plant operation was realised. If an accident requiring ES sctuaticn had occurred, the redundant USRW pump (NR-PlA) would have been available to supply the necessary ecoling .

water requirements.

\h0-

tr. 3. H. Grier, Director July 27, 1977 GQL 0976 (9) Corrective Action:

I:=ediate:

1) NR-P13 was lined up sad selected for ES cperation within four (h) hours. This shift in pu=p line-up was done in a centro 11ed =anner to minimize the effect on Mechanical Draft Cccling TcVer to=perature.
2) All river water pump vibration readings were reviewed and no safety related pu=ps were found to be unacceptable for lenb term cperation.

Long Term:

1) NR-Plc is being overhauled to restere its full operability.

All defective parts, including the top pump shaft section, vill be rep] aced.

2) Necessary changes to the preventive maintenance and operating procedures vill be made to minimize the potential for similar in-service failures in the future.

The Plant Operations Review Cc==ittee and Unit Superintendent have reviewed and approved the above corrective action and have taken steps to assure its ec=pletion.

(10) Failure Date:

Vertical Turbine Pumps Peerless Pump Division (FMC Corporation) 1 stage, 1135 r;=, 2h Ex3 bevl.

Similar Occurrences: 75-1h Cincerely, l -

1 J. G. Herbein Vice President JGH:DGM:rk Attach =ent: Licensee Event Report 1482 DN