ML19261F320

From kanterella
Jump to navigation Jump to search
RO 77-21/1T:on 770726,radiation Monitor RM-A2 Out of Svc & Sample of Reactor Bldg Atmosphere Not Taken within 8-h. Caused by Improper Reassembly Following 770725 Surveillance Test.Monitor Repaired & Sample Taken.Forwards LER
Date released: 10/02/2019 Download: ML19261F320


LER 77-021/01T:on 770726,during Normal Operation,Radiation Monitor RM-A2 Failed & Atmosphere Sampling of Reactor Bldg Not Performed.Caused by Improper Reassembly Following 770725 Surveillance Test.Monitor Repaired.Procedure to Be Revised
ML19261F321
Person / Time
Site: Crane 
Issue date: 08/09/1977
From: Potts W
METROPOLITAN EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19261F321 (1)
RO 77-21/1T:on 770726,radiation Monitor RM-A2 Out of Svc & Sample of Reactor Bldg Atmosphere Not Taken within 8-h. Caused by Improper Reassembly Following 770725 Surveillance Test.Monitor Repaired & Sample Taken.Forwards LER
ML19261F319
Person / Time
Site: Crane 
Issue date: 08/09/1977
From: Herbein J
METROPOLITAN EDISON CO.
To:
References
Download: ML19261F319 (4)