ML19261F114

From kanterella
Jump to navigation Jump to search
Forwards Met Ed Requesting Withholding of B&W Proprietary Info Deleted from TMI-1 Cycle 2 Reload Rept. Encl Withheld (Ref 10CFR2.790)
ML19261F114
Person / Time
Site: Crane Constellation icon.png
Issue date: 04/29/1976
From: Goller K
Office of Nuclear Reactor Regulation
To: Moeller D
Advisory Committee on Reactor Safeguards
References
NUDOCS 7910240326
Download: ML19261F114 (1)


Text

j/"%

UNITED STATES 5

NUCLEAR REGULATORY COMMid.JN g

4 WASHINGTON, D. C. 20665 e

M Y-5 D

T s

/

.70 ' -

Docket No.:

50-289 m

p. 2 91973

,6 ^ # i

.' c ',

(

Dr. Dade W. Moeller, Chairman Advisory Committee on Reactor Safeguards U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Dr. Moeller:

Sixteen copies of the following Category B documents are transmitted for information to the Committee:

Letter dated April 5, 1976, from Metropolitan Edison Company requesting withholding from public disclosure B&W Projirietary information deleted from the Three Mile Island Unit 1 Cycle 2 reload report.

The data transmitted (Cy #'s 4-19) contains Proprietary Data and is being withheld from public disclosure pursuant to 10 CFR Section 2.790(b).

It should not be discussed with persons outside AEC or the Company and should be stored in a manner that its contents do not become available to unauthorized persons.

Sincerely, Karl R. Goller, Assistant Director for Operating Reactors Division of Operating Reactors

Enclosures:

As stated ORB #4: DOR, g

RIngram:rm 7910240' b

i A8i 048