ML19261F105
| ML19261F105 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 12/15/1977 |
| From: | Chilk S NRC OFFICE OF THE SECRETARY (SECY) |
| To: | OFFICE OF THE FEDERAL REGISTER |
| References | |
| NUDOCS 7910240242 | |
| Download: ML19261F105 (1) | |
Text
.
UNITED STATES p 88 coq f
jo NUCLEAR REGULATORY COMMISSION y
WASHINGTON, D. C. 2C555 y, "y.,
e
.E
"*D1 III
[
o
%, * *, e,o#
December 15, 1977 OFFICE oF THE
{
SECRETARY Y
Director Office of the Federal Register National Archives and Records Service Washington,D.C.
20403
Dear Sir:
Enclosed for publication in the Federal Register are an original
~
and two certified copies of a document entitled:
METROPOLITAN EDISON COMPANY" DOCKET No. 50-289 NOTICE OF ISSUANCE OF MIENDMENT TO FACILITY OPERATING LICENSE Publication of the above docu:nent e.t the earliest possible date would be appreciated.
This material is t6 be charged to requisition number D-149.
Sincerely, Samuel J. Chilk Secretary of the Ccmission
Enclosures:
Original and 2 certified cop es bec: ' Records Facility Branch Public Affairs Executive Legal Director Office of Congressional Affairs Office cf the General Counsel
}kb SECY - C&R Branch 7910240 y
7EJO-Ol UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-289 METROPOLITAM EDIS0N C0" patly JERSEY CENTRAL P014ER AND LIGHT C0t'?ANY PENNSYLVANIA tLECTRIC COMPAMY NOTICE OF ISSUAMCE OF AFNDENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Comr.ission (the Commission) has to Facility Operating License No. DPR-50, issued Amendment No. 33 issued to Metropolitan Edison Company, Jersey Central Power and Light Company and Pennsylvania Electric Company (the licensees),
which revi:,ed Technical Specifications for operation of the Three Mile Island Nuclear Station, Unit No. 1 (the facility) located in Dauphin County, Pennsylvania. The amendment is effective as of its date of issuance.
This amendment modifies the provv. ions of the Technical Specifica-tions to increase from 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> the period during which one of a group of redundant components in the emergency core cooling, reactor building emergency cooling or reactor building spray systems could be inoperable during power operation.
The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the The Commission has Act), and the Commission's rules and regulations.
made appropriate findings as required by the Act and the Commission's y
p,q rm b T m ss d L i
jf/6 2Loh]
TC1P240 01/f v' j o 1481 028
s rules and regulations in 10 CFR Chapter I, which are set forth in Prior public notice of this amendment was the license amendment.
not required since the amendraent does not involve a significant hazards consideration.
The Commission has determined that the issuance will not result in any significant environmental impact and that pursuant to 10 CFR 151.5(d)(4) an environmental impact statem or negative declaration and environmental impact appraisal need be prepared in connection with issuance of this amendment.
For further details with respect to this action, see (1) the 28,1977,(2) Amendment application for amendment dated October to License No. DPR-50, and (3) the Commission's related No. 33 All of these items are available for public Safety Evaluation.
inspection at'the Commission's Public Document Room, 1717 H S N. W., Washington, D. C. and at the Government Publications Se State Library of Pennsylvania, Box 1601 (Education Building),
A copy of items (2) and (3) may be obtained Harrisburg, Pennsylvania.
upon request addressed to the U. S. Nuclear Regulatory Comm Director, Division of Operating Washington, D. C. 20555, Attention:
Reactors.
1977.
lith day of Occember Dated at Bethesda, Maryldsd, this FOR THE NUCLEAR REGULATORY C
,/w k/'... s:,
Robert W. Reid, Chief Operatina Reactors Branch 54 Division of Operating Reactors
)&\\