ML19261E913
| ML19261E913 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 09/05/1968 |
| From: | Moseley N US ATOMIC ENERGY COMMISSION (AEC) |
| To: | James O'Reilly US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 7910170971 | |
| Download: ML19261E913 (1) | |
Text
.
UNITED STATES ATOMIC ENERGY COMMISSION DIVISION F COMPT !ANCE 201 645
\\ -l 4
- C.
l 1
nemon o 970 BROAD STREET s
NEWARK. NEW JERSEY 07102 September 5, 1968 J.
P.
O'Reilly, Chief, Reactor Inspectiori and Enforcement Branch, Division of Compliance, HQ METROPOLITAN EDISON COMPANY DOCKET NO. 50-298 The attached report by the assigned inspector of a visit on August 22, 1968 to the subject facility is forwarded for in-formation.
This visit was the initial visit to the site and included a meeting with management to discuss the Compliance program.
The 3enior Reactor Inspector acccmpanied the assigned inspector on the visit.
The licensee management expressed a strong desire and intention to provide a quality assurance program which will be effective.
An example of this commitment is the removal of about 475 cubic yar'ds of concrete from the containment foundation after test cylinder results were found to be erratic.
k O'
N.
C. Moseley Senior Reactor Inspector
Enclosure:
kN CO Report No. 399/68-1 by F.
S.
Cantrell dated 8/30/68 cc:
E. G. Case, DRS 1483 204 R.
S.
Boyd, DRL (2)
S.
Levine, DRL (6)
D.
J.
Skovholt, DRL (3)
L.
Kornblith, Jr.,
CO Regional Directors, CO REG files
/
a 7910170__f y a
U.
S. ATOMIC ENERGY COMMISSION REGION I DIVISION OF COMPLIANCE Report of Inspection CO Report No. 289/68-1 METROPOLITAN EDISON COMPANY Licensee:
(Three Mile Island Nuclear 5<ation)
Provisional Construction Permit No. CPPR-40 Date of Inspection:
August 22, 1968 Date of Previous Inspection:
None 8d Inspected By:
~
'Dats F. 'S. Cantrell, /6&fctor Inspector f
M Reviewed By:
' Ddte N. C. Moseley, SeniffReactorInspector
SUMMARY
A meeting was held at the offices of the Metropolitan Edison Company in Reading, Pennsylvania, to discuss the Compliance inspection program with management.
A tour of the Three Mile Island constructicn site was made after the meeting.
DETAILS I.
Management Meeting Persons atrending included:
)
Mr. Ralph Niedig, Vice Mr. John Miller, Chief Mr. George Bierman, Pr DUPLICATE DOCUMENT Mr. George Heward, Man g
Entire document previously entered into system under:
l ANO 79/0//oo A 7 I dfl h
No. of pages:
,