m u,5 UNITED STATES T
-*^
ATOMIC ENERGY COMMISSION N
DIVISION OF COMPT.!ANCg 201 6 '. 5 -
l REGION 1 e, /
[
970 BROAD STREET
\\;,,
9 N EW A R K. NEW JERSEY 07102 October 18, 1968 J.
P. O'Reilly, Chief, Reactor Inspection and Enforcement Branch, Division of Compliance, HQ METROPCL:'IaN EDISON COMPANY MCKET NO. 50-289
'ite attached report of a visit by the assigned inspector to the subject facility on September 18 and 19, 1968 is forwarded for information.
No violations of the SAR were noted.
The cac3e cf previcusly reported quality problems with concrete has been determined by the licensee to be failure to properly centrcl the mix temperature.
Satisfactory corrective action has been taken.
The inspector noted concrete being dropped from a distance in excess of the approved job specification.
Corrective action was taken by the licensee.
Metropolitan Edison has begun sericus planning and work in preparing preoperational testing procedures.
We are very pleased at this effort so early in the construction of this plant.
O
~
N.
C. Moseley Senior Reactor Inspector E*cicsure:
C3 Report No. 289/68-2 by F.
S.
Cantrell dated 10/18/68 cc:
E.
G.
Case, DR3 R.
S. Scyd, DRL (2) 3.
Levine, ORL (6)
D.
J.
Skovholt, ERL (3) l4h) lhh L.
Kornblith, Jr.,
CO Regi0nal Directors, CO REG filas 7910170
t U.
S. ATOMIC ENERGY COMMISSIOil REGION I DIVISION OF COMPLIANCE Report of Inspection CO Report No. 289/68-2 Licensee:
METROPOLITAN EDISON COMPANY (Three Mile Island Nuclear Station)
Provisional Construction Permit No. CPPR-40 Date of Inspection:
September 18-19, 1968 Date of Previous Inspection:
August 22, 1968
/d/T!/Y Inspected By:
if F.
S.
Cantrel[#'deactor Inspectcr 6 ate #
b
/C!/8 Reviewed By:
/
N.
C. Moseley, Sen%6r Reactor Inspector batd SCOPE A routine announced inspection was made of the 2452.Mwt pressurized water power reactor now under construction en Three Mile Island near Middletown, Pa.
The inspection effort was directed toward the overall quality assurance program, and a review of the concrete problem reported on the initial. spection.
A scheduled meeting was held at the site with operating personnel on preparation of preoperational test procedures.
'"""^"'
1483 199 Rafety Items - None Status of Previousiv Recorted visit in August, the contracto uniform concrete as shown by t DUPLICATE DOCUMENT cylinder break test.
Strict 1 and temperature and United Sta Entire document previously respcnsibility for acccpting e entered into system under: