ML19261E892
| ML19261E892 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 06/11/1969 |
| From: | James O'Reilly US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Boyd R US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 7910170949 | |
| Download: ML19261E892 (1) | |
Text
pu c,
e
-g UNITED STATES s
).\\
ATOMIC ENERGY COMMISSION 4
~)
W ASHINGTON. D.C.
20545 gj; gg f
- rrs e
- a.. ;, p.nsistant Director fcr Peacter Projects Di.2.;ica of Reactor Licensing (2)
IITPCFCLITA.4 ZDISOII CCMPANY - TH?EE MILE ISLAND NO.1 rc 33rg c go, gy9 fog.2
~...;
.u _.c u: a report o an inspection visit to the subject fa cilit.
- _. c
_J, 1:r39, is forwarded for information.
~-
.i.nli.y.'.. cne item of noncenformance, failure tc quality re:.r*
.. C. <e rn e.; requireu uy Section III of the ASPE Coce anc cne iter:-
- ;. nuve cafety icplications, bulging of the reactor bleet ta:u
.2-m nt _Le J'2r.cticn with the side valls. The licensee auvised cur in.;pector tnat these problets vill be corrected anc tnat an en ineerin.; evaluati6n of the reactor bleed tank problem vill 'ce C';r inspector vill review these items during future in-aw.
in; prcvide the cetails in appropriate inspection reports.
(br nemicnu anciar recora.endations vill be basec cn inspection
. in :in g.
Origmal.r.eJ by
,_ J. P. O'Reay J. P. O'Reilly, Chief Reactor Inspection anu Enforcement 3 ranch Division of Compliance Encicsun:
CC ?eport No. 29/ 09-e
- c viencicsure:
3.
"r w, D?1 2 L (..)
l< :..e,
~
I ur.'.v r.ci t, ERL (3)
L. Ecrnelith, Jr., CO J,
- 3. Eevis, CO:II 3.
H.
Grier, CO:III
- . a'a L t.e r, CD: I'i i483 lpg r.
. s=1 =, Co a
~
- 2. :'cseley, CD:I v/ o encl y Cen'.ra. File
--