Forwards Insp Rept 50-289/69-03 on 690516.No Noncompliance Noted
ML19261E885
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/19/1969
From: Moseley N
US ATOMIC ENERGY COMMISSION (AEC)
To: James O'Reilly
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 7910170943
Download: ML19261E885 (1)


Text

.

s

,s'_

....n,

.....:., z..x. a

-f.

.s. _ \\\\,

,-n

,n

  • c- ~ *
  • n.V

..w

..,.~.,sr-e.,..

4. -, c. v.

ei t

. vv

. C '-. I.

C;V;0iCN CF Co:4?L:ANC:

(.

g, s -

.w.CN I

' Q,,

G70 O3 CAD sTRCCT N ZW A 3.<. NZW JZasIY C7102

^8E^

CCDEi N-rccces o s ci e4s. 3 94 2

&M ML*LY REFER TOs Jane 19, 1969 J.

?. O'Reilly, Chief, Reactor Inspection and Enforcement Branch, Division of Compliance, EQ

.ETRC?OLITAN EDISCN CCMPANY - THREE MILE ISLAND UNIT NO. 1 aw.u.,,,,,. -,., %.O. su 3 9

--. o 7ne attached report of a visit to the subject facility on May 16, 1969 is forwarded for information.

No items of noncon"cr ance and no safety items were detected.

7..e licensee's site receiving inspection detected defects in cas stainless steel floor drain fittings.

As a result, 40 of the fittings were rejected.

/)lC(. *T'/ cP; u 67.

Moseley Senior Reactor Inspector

Enclosure:

CO Report No. 239/69-3 by D.

E. iTaitesell dated 6/12/69 OO D

D 0

a cc:

E.

G.

Case, CRS

- r I,a

[

u od dLL GJ t2 g-)

s.

s.

awya, uau S.

Levine, DRL (6)

D.

J.

Skovholt, DRL (3)

L.

Nornblith, Jr.,

CO Regional Directors, CO

--n

a-e N

e esa 1483 114

s U.

S. ATOMIC ENERGY COMMISSION REGION I DIVISION OF COMPLIANCE Report of Inspection CO Report No. 289/69-3 Licensee:

Metropolitan Edison Company (Three Mile Island Unit 1)

License No. CPPR-40 Category A Date of Inspection:

May 16, 1969 Date of Previous spection:

April 8-10, 1969 Inspected By:

>> 3 4//2./44 D.

E. Whitesell, Reactor Inspector (Constr)

Date If Reviewed By:

r N. C. Mose' ley, Senfor Reactor Inspector Date Proprietary Information:

None

SUMMARY

The Reactor Bleed Tanks, field fabricated by Pittsburgh Des Moines (PDM), are finished and set in place, and are awaiting the ASME code inspector to witness the hydrostatic test for acceptance.

The question concerning potential stresses induced by poor head fit-up remains outstanding.

An engineering evaluation by UE&C is scheduled.

The inspector was informed by Met-Ed's site Quality Assurance Engineer, that forty (40) stainless steel floor drain castings had been rejected and returned to Zurn Manufacturing Com an for re-placement.

Test coupons are being prepa DUPLICATE DOCUMENT procedures for the joining a Piping.

Entire document previously entered into system under:

CB&I's Quality Control Plan 1483 i15 No. of ge9es:

ey'

' ~