ML19261E406

From kanterella
Jump to navigation Jump to search
Notifies That Rept on Records Search Requested by IE Bulletin 78012 Is Currently Underway by C-E.Final Response Re Reactor Vessels Will Be Submitted by 790629
ML19261E406
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 05/29/1979
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
2-059-9, 2-59-9, NUDOCS 7907060411
Download: ML19261E406 (1)


Text

' CENTRAL FILES r-- a PDR:HQ

) N hh Y tf flSIC ARKANSAS POWER & LIGHT COrv.. -. .

POST OFFICE COX 551 LITTLE ROCK. ARKANSAS 72203 (501) 371-4 COO May 29, 1979 2-059-9 Mr. K.V. Seyfrit, Director Office of Inspection & Enforcement U.S. Nuclear Regulatory Comission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011

Subject:

Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 IE Bulletin 78-12 File: 2-1510.1 Gentlemen:

Our reactor vessel manufacturer, Combustion Engineering, Inc. , is currently engaged in performing the records search requested by I & E Bulletin 78-12 (as modified by Supplements 12A and 12B). C-E has advised us, and notified Mr. H.D. Thornburg of the staff, that they plan to submit a generic report directly to the NRC before June 8,1979 covering all reactor vessels manufactured by C-E. We will then reference their generic report in our final response to the bulletin. This final response will be submitted to you on or before June 29, 1979.

Very truly yours, bCrve/ [. Y David C. Trimble Manager, Licensing DCT: ERG: gw cc: fir. W.D. Johnson U.S. Nuclear Regulatory Comission P. O. Box 2090 Russellville, AR 72801

O ;ro L /c jo 7 9070 UDM /#

ME F *BE A M'OOLE SOU TH UTIUTIES SYSTEM