ML19261E193
| ML19261E193 | |
| Person / Time | |
|---|---|
| Site: | Maine Yankee |
| Issue date: | 05/23/1979 |
| From: | Moody D Maine Yankee |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| WMY 79-57, WMY-79-57, NUDOCS 7907050258 | |
| Download: ML19261E193 (3) | |
Text
9 n
wa MAIRE HARHEE 'Aluml0POWERC0mPARU e ru~~ ~ n"OAo mr +
M wtSTBORO VASSACHUSf TTS Ol'At
[
ENGINEERING OF F'CE b l 7-366-W I 1 TO B.4.1.1.
EMY 79-57 May 23, 1979 United States Nuclear Regulatory Cc==1ssion Inspection and Enforcement Office Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 ATTENTION:
Mr. Boyce H. Grier, Director
References:
(a) License No. DPR-36 (Docket 50-309)
(b) Letter, USNRC to MYAPC dated May 11, 1979 with enclosure IE Bulletin 79-10
Dear Sir:
Subject:
Response to I&E Bulletin 79-10 The following inforcation is provided in response to reference (b).
Should any additional information be required relative to this subject, please contact Mr. E. W. Jackson of this office.
Very truly yours.
MAINE YANKEE ATOMIC POWER COMPANY
.b. J w D. E. Moody Manager of Operations DEM/scw Enc.
^ tr o 107
[r90 is L 7907050 A T I
)
IE Bulltin No. 79-10 Date:
Hay 11, 1979 TABLE I Utility:
HAINE YAMREE ATOMIC POWER COMPANY Date:
May 22, 1979 Facility:
MAINE YAMREE ATOMIC POWER COMPMIT Operators Senior Operators Exam Exam Exam Exan Exam Exam Exam Exam 1
2 3
4 1
2 3
4 1.
Action 1:
Responses A.
Total number f ailed annual examination 0
0 0
0 0
0 0
0 B.
Percent that failed annual examination 0%
0%
0%
0%
0%
0%
0%
0%
2.
Action 2:
Responses A.
Percent required to attend additional 100%
100%
91%
100%
93%
36%
50%
67%
1 1
1 1
1 1
1 1
lec tures B.
Number of operators attending scecified 4/20 7/2G 10/3G 5/30 13/20 4/26 6/36 8/20 number of l'ectures 2
2 2
2 2
2 2
2 (no. of operators /no.
of lectures)
NOTE:1.
Data p sented in 2.A is a ratio of the number of cperators (or senior operators) who attained a score of less than 804 in any catacory examined, to, the number of cperators (or senioF-operators) examined; cimes 100.
To ensure that these percentages are not misinterpreted the following additional informatica is provided:
OPERATORS SENIOR OPERATORS EXMIINATION /WERAGE EXMIINATION AVERAGE Exam Exam Exam Exam Exam Exam Exam Exam 1
2 3
4 1
2 3
4 81%
76%
82%
84h 85%
91%
86%
87%
NOTE:2.
Data presented in 2.B in the number of operators who attained a score of less than 80% in any category examined /the number of manditory lectures presented.
20
IE Bulltin Zio. 79-10 Date:
May 11, 1979 TABLE I (Continued)
Utility:
HAI!!E 77dIKEE ATOMIC POWER COMPANY Date:
May 22, 1979 Facility:
MAI!TE *iANKEE ATCt!IC POWER COMPA TY Operators Senior Operators Exan Exam Exam Exam Exam Exam Exam Exam 1
2 3
4 1
2 3
4 3.
Actions 3:
Responsen A.
Total number attending accelerated training because < 703 cn annual wr itten examination 0
0 0
0 0
0 0
0 B.
Percent attending accelerated training lenacn because < 70%
cn annual written examination 0%
0%
0%
0%
0%
0%
0%
0%
C.
Total number attending accelerated training because unsatisfactory oral examiniarica 0
0 0
0 0
0 0
0 D.
Percent attending accelerated training because unsatisfactory cral examination 0%
0%
0%
0%
0%
0%
0%
0%
Date of Exam 1 - 01/78 2 - 01/77 3 - 01/76 4 - 05/75 nit
'[9:kb