UMC UNITED NUCLEAR C O R P O R A T l O N In Reply, Please e7 s4Nov ossant aoao Refer To:
UNC ASVILLE, CON NECTICUT 06 38 2 Tata e 4 e-i s u NIS: 79-4-28 April 12, 1979 Mr. George H.
Smith, Chief Fuel Facility and Materials Safety Branch U.S.
Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406
Subject:
Inspection 70-371/79-01
Reference:
(1)
- Letter, G.H.
Smith, NRC, to D.E.
Ganley, UNC, dated February 14, 1979 (2)
- Letter, D.E.
Ganley, UNC, to G.H.
Smith, NRC, dated March 9, 1979.
(3)
- Telecon, J.
Roth, NRC, to W.F.
Kirk, UNC, on April 11, 1979.
Dear Sir:
As discussed per ref. (3), we are adding clarification to the following items of ref. (2).
Appendix A,
Item D and Para. 5.c(3) of Details Postina of Controlled Area The notice wording posted is shown below:
"Use of this door as a personnel entrance - Exit is controlled via written Health Physics Evaluation.
Current Approved Traffic (1)
For Access to Sectioning Area Showers (2)
Emergency Exit From Spec Lab (3)
Hand Carrying Bagged Trash From Labs to Compactor Area (4)
Transfer of SNM to and from Materials Balance Area 3 and 4 "
79062603 %
2311 085
Mr.
G.H.
Smith Page 2 April 12, 1979 Appendix A,
Item E and Para. 5.f of Details NIS Approval of Documents Subparagraph 2.
Corrective steps which will be taken to avoid further items of non-compliance Although we do not anticipate detecting any procedures un-acceptable to NRC license requirements in our review of procedure documents on the Divisional Master List of Approved Documents, should any spurious procedure be encountered which is unacceptable, immediate action shall be taken to correct items affected by the procedure prior to any further work.
An acceptable signoff on the MLAD will represent that the pro-cedure review is satisfactory to NIS nuclear safety requirements.
Should further information be required, please contact us.
Very truly yours, UNITED NUCLEAR CORPORATION David E.
Ganley President and General $$ nager Naval Products Division