ML19261D707
| ML19261D707 | |
| Person / Time | |
|---|---|
| Site: | 07001201 |
| Issue date: | 04/26/1979 |
| From: | Sutherland J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Silk E BABCOCK & WILCOX CO. |
| Shared Package | |
| ML19261D708 | List: |
| References | |
| NUDOCS 7906260088 | |
| Download: ML19261D707 (2) | |
Text
.
~7'If4LA t
fC #/N/
UNITED STATES M Md ag -
e# "300
[(p 9'o,,
NUCLEAR REGULATORY COMMISSION v
'o REGloN il
}
101 M ARIETTA STREET. N.W.
5*k ATLANTA, GEORGI A 30303
%..v /
In Reply Refer To RII:DJP 70-1201/79-8 Babcock and Wilcox Company ATTN:
Mr. E. J. Silk, Plant Manager Nuclear Materials Division Commercial Nuclear Fuel Plant (CNFP)
P. O. Box 1260 Lynchburg, VA 24505 Gentlemen:
This refers to the inspection conducted by D. J. Perrotti of this office on March 19-23, 1979, of activities authorized by NRC License No. SNM-1168 for the Commercial Nuclear Fuel Plant facility, and to the discussion of our findings held with R. Alto at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously identified enforcement matters and unresolved items. The status of these items is discussed in the enclosed report.
One new unresolved item resulted from this inspection and is discussed in the enclosed report. This item will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's "Reles of Practice", T tt Title 10, Code of Federal Regulations, a copy of this letter and tht sioud this inspection report will be placed in the NRC's Public Document Room.
report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure.
Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document.
If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
2313 023 790 62600 4 c
' ~
APR 2 61979 4
Babcox and Wilcox Company Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely, W lbof d
e J. T. Sutherland, Chief Fuel Facility and Materials Safety Branch
Enclosure:
Inspection Report No. 70-1201/79-8 2313 024 e