lNDIANA a MICHIGAN POWER COMPANY P. o. BO X 18 BOWLING GRE EN ST ATioN N E W YoR K, N. Y.10004 April 26,1979 AEP:NRC:00180 Donald C. Cook Nuclear Plant Units No.1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 Mr. J. G. Keppler, Regional Director U. S. Nuclear Regulatory Commission Office of Inspection & Enforcement Region III 799 Roosevelt Road Glen Ellyn, Illinois 60133
Dear Mr. Keppler:
This letter is in response to Mr. A. B. Davis' letter of March 28, 1979, which we received April 2,1979, transmitting to us IE Report No. 5_0-315/79-03 and No. 50-316/79-03.
Contrary to a plant procedure which is required to be implemented under Technical Specification 6.8.1.e, an exclusion area evacuation drill was not conducted during 1978.
The corrective action taken was to perform such a drill on April 18, 1979, and the achieved result was the successful completion of the drill.
The corrective action taken to avoid the future re-occurrence of this infraction was to develop a completion schedule for emergency plan drills.
The Donald C. Cook Nuclear Plant is now in full compliance with its procedure and Technical Specifications.
Very truly yours,
(
I.
JED:em ohn E, Dolan ice President 2312 323 lAY 1 1979 7906260083