ML19261D688

From kanterella
Jump to navigation Jump to search
Forwards IE Info Notice 79-12, Attempted Damage to New Fuel Assemblies
ML19261D688
Person / Time
Site: MIT Nuclear Research Reactor
Issue date: 05/11/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lisa Clark
MASSACHUSETTS INSTITUTE OF TECHNOLOGY, CAMBRIDGE
References
NUDOCS 7906260059
Download: ML19261D688 (1)


Text

. gr.

mes UNITED STATIS t " "'GW, k

[p NUCLEAR REGULATORY COMMISSION

{i a,)

{ }g') q#.( g j

REGION I esi paan avanue

.ps,

xina or enussia. PENNSYl.V ANI A 19406

/

g

,y May 11, 1979 Docket No. 50-20 Massachusetts Institute of Technology Research Reactor ATTN:

Mr. L icoln Clark, Jr.

Direcur of Reactor Operations 138 Albany Street Cambridge, Massachusetts 02139 Gentlemen:

This Information Notice is provided as an early notification of a possibly significant matter.

It is expected that recipients will review the information for possible applicability to their facilities.

No specific action or response is requested at this time.

If further NRC eva,uations so indicate, an IE Circular or Bulletin will be issued to recommend or request specific licensee actions.

If you have any questions regarding this matter, please contact this office.

Sincerely, Boyce H. Grier

~ Director

Enclosure:

IE Information Notice No. 79-12 cc w/encls:

Dr. O. K. Harling, Director of the Reactor Laboratory 2312 283

?oneno oos<p V

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 IE Information Notice No. 79-12 Date:

May 11, 1979 Page 1 of 1 ATTEMPTED DAMAGE TO NEW FUEL ASSEMBLIES This Notice provides information concerning the surreptitous introduction of a possibly damaging liquid inte the new fuel storage pool at the Virginia Electric and Power Company, Surry Power Station in Surry County, Virginia.

On Monday., May 7,1979, while conducting inspections of new fuel for Unit 2, the licensee found that plastic protective liners on 62 of 64 assemblies had been tampered with.

Further inspection revealed that a white crystalline substance had been poured onto the assemblies.

Preliminary analysis by VEPC0 indicates that the substance is sodium hydroxide. The new fuel is stored in the Fuel Building, an area which is locked and alarmed, and to which access is controlled by the issuance of specially coded access cards.

These cards are issued after the successful completion of a background screening program for both Virginia Electric and Power Company and contractor personnel.

The FBI is presently on-site conducting an extensive investigation.

Westinghouse, the fuel vendor, is assisting in the evaluation of possible fuel damage.

This event could possibly provoke similar behavior on the part of other persons.

Consequently, you should be aware of such an eventuality.

At this time the NRC is not placing additional requirements on you, but is advising that extra caution be exercised in your existing security program.

This Information Notice is provided as an early notification of a possibly significant matter.

It is expected that recipients will review the information for possible applicability of their facilities.

No specific action or response is requested at this time.

If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recommend or request specific licensee actions.

If you have questions regarding the matter, please contact the Director of the appropriate NRC Regional Office.

No written response to this Infonnation Notice is required.

Enclosure:

List of IE Information Notices Issued in 1979 2312 284 W

06 q906

IE Information Notice No. 79-12 Date:

May 11, 1979 Page 1 of 1 LISTING 0F IE INFORMATION NOTICES ISSUED IN 1979 Information Subject Date Issued To Notice No.

Issued 79-01 Bergen-Paterson Hydraulic 2/2/79 All power reactor Shock and Sway Arrestor facilities with an Operating License (OL) or Construction Permit (CP) 79-02 Attempted Extortion -

2/2/79 All Fuel Facilities Low Enriched Uranium 79-03 Limitorque Valve Geared 2/9/79 All power reactor Limit Switch Lubricant fucilities with an OL or CP 79-04 Degradation of 2/16/79 All power reactor Engineered facilities with an Safety Features OL or CP 79-05 Use of Improper Materials 3/21/79 All power reactor in Safety-Related Components facilities with an OL or CP 79-06 Stress Analysis of 3/23/79 All power reactor Safety-Related Piping facilities with an OL or CP 79-07 Rupture of Radwaste Tanks 3/26/79 All power reactor facilities with an OL or CP 79-08 Interconnection of 3/28/79 All power reactor Contaminated Systems with facilities with an Service Air Systems Used OL and Pu Processing As the Source of Breathing fuel facilities Air 79-09 Spill of Radioactively 3/30/79 All power reactor Contaminated Resin facilities with an OL 79-10 Nonconforming Pipe 4/16/79 All power reactor Support Struts facilities with a CP 79-11 Lower Reactor Vessel Head 5/7/79 All power reactor Insulation Support Problem facilities with an OL or CP 2312 285