Monthly Operating Rept for May 1979
ML19261D495
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/10/1979
From: Alden W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML19261D494 List:
References
NUDOCS 7906190331
Download: ML19261D495 (10)


Text

'

, AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 277 UNIT PEACH BOTTOM UNIT 2 DATE JUNE 10,1979 COMPANY PHILADELPHIA ELECTRIC COMPANY N.N.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION 01 VISION-NUCLEAR TELEPHuNE (215) 841-5022 MONTH MAY 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 1071 17 0 2 1068 18 0 3 1067 19 0 4 1061 20 3

> 1073 21 0 6 1072 22 0 7 1071 23 0 6 1076 24 368 9 1074 25 840 10 1071 26 726 11 1067 27 925 12 1057 28 10o4 13 747 29 1066 14 0 30 1069 15 0 31 1069 ~

16 0 7 9 0 619 0 3 3t 2308 160

~

D*9D M;ngu )f o c Mr [D)'ut( i,]l

. uPERATING DAIA REPCRT f

. . a 00C AE 1 NO. $O - iTT DATE JLNE 10,197v COMPLEIE0 bY PHILADELPHIA ELECTk1C COMPANY W.M.ALOLN ENGINEER-IN-CNARLi NLCLEAR SECTILN GENERATIGN OlV!h10N-NVCLEAm TELEPHONE (215) 641-h022 OPERATING $1ATUS

1. UNIT NAME: PEACH bOITCM UN11 2 1 NOIkS* TH15 L' NIT kXPERikNLtL wNt 1

==_____ _____

l l

2. REPORTING PERIOD: MAY, 1979 l OUIAGE THIS MONIH I 1 1
3. LICENSED THiRMAL POWERINWT ): 3293 1 3

=

1 1

  • . NAMEPLATE RATING 4GRCSS MWE): 1152 1 8 l l S. OkSIGN ELECTRICAL RATING (NET MWE): 1065 l l

.__. ___ g l

o. max 1 MUM DhPcNDAnLe CAPALITY (G4055 MwE)* 1098 l l l l
7. max! MUM CEPENOABLE CAPACITY (NET MWE)* 1051 1 1

= ___- .___

u. IF CHANGE S OCCUR IN CAPACITY AATINGS IITEMS NUMBER 3 THROUGH 7) SINCE L AST REPCRT, GivE RE A50N58
9. POWER LEVEL 10 WHICH RtSTRICTED, IF ANY INET MwE):
10. REASONS FOR RESTRICTIONS, IF ANY:

TH1$ MCNTH YR-TO-OATE LOMULATIVe

11. H00RS IN ktPORilNG PERIGO 744 3,623 43,0G7
12. NUMBtk QF NGURS RE ACTOR WAS CRITICAL Sob 3,281 31,701

. =- =- __

13. REACTOR RE5tRVE SMUTCOWN MOURS G.0 00 D.o

== - ..

1*. HOUR S GENER AIOR ON-LINE 493.4 3,257.3 31,944.1

15. UNIT RESERVE SNUTDOWN HLLAS 0.0 0.0 0.0 lo. GRL55 THLRMAL ENERGY GENERATED (MWH) 1.5*3,238 10, c*,922 90,oit,379

........____ ..... _=

17. GROSS ELiCTRICAL ENERGY GiNERATED (MWH) 515,260 3,468,300 69,6$4,230
18. NkI ELECIRICAL ENERGY GENERATED (MsH) *vs 6ol 3,374,540 46,*15,695
19. UNIT SERVICE FACTOR 6o.) 69 9 7*.3
10. UNIT AfAILAslL11Y FACIOR o6.3 69.9 74 3

=_ -

21. UNIT C AP AC I TY FACTLA (USING MDC NET) 63.1 68.o 04.y
22. UNIT CAPACITY FACTOR IUSING DER NET) 62 3 S7.S 62 0
23. UNIT FORChe OUTAGE RATE ,

0.0 1.0 I 2*. 5HU100wN5 SCHtDULED OVER NEXT 6 MONTHS (TYPc, OATE, AND GURATION OF EACN)3 is. IF SHUT 00WN AT END OF REPORT PERIOD, E STIMATED DATE OF ST ARTUP: N/A 2308 161

26. UNITS IN TEST STA1US (PRIOR TO COMMERCIAL OPERA 110N): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

i L:

0411 SkUILOmN5 AND POWEk kt0DCI1045 DOCKET hD. $0 - 277

! UNil hAME PEACH 60110M UN11 2 .

Daft JuNL 10.197W

{

RtPLkt MONIH mar, 1919 COMPLE TED SY PHIL ADLLPHI A ELELTRIC CDNPANT

f. - -- -
f. W.M.ALOLN 5 ENGINEER-IN-CHARGE NDCLLAR SECilb4 GENERAI!ON DIV1510N-MUCLEAR TELEPHONE (21$3 641-SO22

__ -==

_ = __

l l l l l METHsb LF l LICENSEE 15Y51tMICOMFuhth11 CAust Ako CORRECTIVE l ITYPL10URATIONikEA5LN15Hu1 TING DOWN1 EVtNT l CODE I CODE l ACilON TO NO.1 DAIL l till (Hobkkil (2) I ktallok (33 i REPORI 8 8 84) l tbl l PREVENT RECURREkCE I i l i I I I .I i 4 1 790$13 1 5 1 230.6 1 0 l 1 l NONE I M8 l HTkRCH I RECDMSINER CONDENSEA MARIENANCE AND FLECWA114 l l l l l l l l 1 HEATER REPARR I I I ----- 1 I I I I i

,, 1 I I 250.6 l 1 1 I l l 9

1 f

til (2) (sl (4)

'.7

= F - FORCED REASON METHOC LRH1881 G - IN51kUCTIGNS 2 5 - SLHEOuttD A - ECUIPMENI F AILbkt (ERPLAIN) 1 - MAhuAL FOR PREPARAT!DN OF DATA N b - MAIMIENANCL Dn Ith) 2 - MANLAL SLkAM. ENIkY ShlETS FOk LICENSEE 7 C - EEfutLING 3 - AulOMAllC SCR AM. EVENT REPOkT ILtR)

[s b - KLCULA10kV kthiklCTIoh 4 - ulHtR ttXFLAIN) FILL thJkEG-Olbt!

J L - GPikATuk IMAINING + Ll(tN5L LNAMINAllbN

y. F - A DM I N! h TR A T I V E ($1 i G - OPEkATIONAL EkkOs (EAPLAIN) 3 h - DIPLklEXPLAlk) LXHlb!1 1 - SAME SDUkLE

.7 N

u CD CD

. N r ,

AVERAGE DAILY UNil POWER LEVEL COLKET NU. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE JUNE 10,1979 CGMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENER AllLN DIVISION-NUCLE AR TELEPHONE (215) 841-5022 MONTH MAY 1979 LAY AVERAGt DAILY POWER LbvEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 955 17 944 c 960 18 890 a 953 19 524

  • 956 20 932 5 955 21 934 6 954 22 942 7 956 23 943 8 957 24 939 9 957 25 940 10 954 26 940 11 947 27 940 12 940 28 937 13 940 29 940 14 937 30 939 15 938 31 942 to 948 2308 163

. OPERATING DATA REPORT DOCRET NO. 50 - 278 DATE JUNE 10.1979 COMPLETED SY PHIL ADELPHI A ELECTRIC COMPANY

- ==.-..... ..--....

W.M.ALDEN E NGIN E E R-I N-CH AR GE NUCL E AR SECTION GENERATION DIVISION-NUCLE AR TELE PHONE (21SI 841-$022 Q#ERATING STATUS *

1. UNIT NAMES PEACH BOTTOM UNIT 3 l NOTEss THIS UNIT EXPERIENCED ONE I 1 I
2. R E POR T I NG PE R100 MAY, 1979 l MAJOR POWER REDUCTION THIS I l l
3. LICENSED THERMAL POWERIMWTis 3293 i MONTH I I l 6 NAMEPLATE RATING IGROSS MWEls 1152 1 1 1 i
v. DESIGN ELECTRICAL 4ATING (NET MWEl s 1065 l 1 l l
6. MAXIMUM DEPENDASLE CAPACITY ( GROS $ MWE l s 1098 l 1 1 I
7. MAXIMUN DE PE NOASLE CAP ACITY INET NWEla 103S I I
8. IF CHANGES OCCUR IN CAPACITY RATINGS IITEMS NUM8ER 3 THROUGH 78 SINCE LAST REPORT, GIVE RE ASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY INET MWEla
10. RE ASONS FOR RESTRICTIONS, IF ANY:

THIS MONTH YR-TO-DATE COMULA11VE

11. HOURS IN RE PORTING PERIDO 744 3,623 38,903

.__.==

12. NUMBE R of HOURS RE ACTOR WAS CRITICAL 744 3.320 31,429
13. R E ACTOR A R $ERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 744 .0 3,211.7 30,'641.6 1$. UNIT RESERVE SHUTDOWN HOURS 00 0.0 00
16. GaOSS THERMAL ENERGY GENERATED IMWHI 2.186,21S 9,886,910 84,761,046
17. GROSS ELECTRICAL ENERGY GENERATED (MWHI 719,48b 3,273,270 27,501,380
19. NET ELECTRICAL EFERGY GENERATED (MWHI 691,974 3,163,427 26,406,570
19. UNIT SE RVICE FACTOR 100.0 88.6 78.8
20. UNIT AVAILASILITY F ACTOR 100.0 88.6 78.8
21. UNIT CAPACITY F ACTOR ( US ING MOC NE T ) 89.9 84.4 65.6
22. uMIT CAPACITY F ACTOR IUSING. DER. NET) 87.3 82.0 63.T ...
23. UNIT FORCED OUTAGE RATE 0.0 0.8 6.9
24. SHUTDOWNS SCHEDutED DVER NEXT 6 MONTHS (TYPE, DATE. AND DUR ATION OF EACHl 9/B/79 TO 10/27/79 mEFUELING OUTAGE 08 164' 2 5. I F SHUTDO WN A T END OF RE PORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
26. UNITS IN TEST STATUS (?AIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY --

INITIAL ELECTRICITY

  • COMMERCIAL OPERATION

UN11 ShulDOuN5 AND POWEk REUUC11DN5 DOCKET NO. SD - 278 i l

UN11 NAME PtACN BUIIOM UN!I 3 ,

DAIE JUNE 10.1979 kEPOk1 MUNIH MAY, 1979 COMPLEIED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDLN E NGINE E R-IN-C H ARGE NUCLEAR SEC11bN GENERATION Olv1110N-NUCLEAR TELEPHONE (21$) 641-5022 l l l l l METHOD UF l LICENSEE 15VS1EMICOMPbNENil CAUSE AND CDRRECTIVE l lTYPElDURATIDI;1REA50N15HUITING OOWNI EVENT 1 CODE l CODE l AC110N TO NO,1 DA1E l (lli (HOUR $ 3 8 (2) 1 REAC10k 138 l REPOR1 8 l (*) l (S) l PREVENT RELURKiNCE ._

1 1 I I I I I I I 9 l 190519 I 5 1 0.0 1 B l 1 1 NONE I RC l ZZZZZZ l EDAD OROP 10 REQUCE RADIA11DN FUR OUTAGE l l 1 i l i l  ! l M411LNANCE WGRE fuNIT 28 l l l l l l l I  !

I i 1 - 1 I I I I I l

(2) (3) (4) til F - FORCED REASON METHOD ERH1811 G - IN5TkUCTIONS

~

5 - SCHEDULED A - EGUIPMENT FA1 LUKE (EXPLAIN) 1 - NANUAL FOR PkEPARATIDN OF DATA

  • b - MAINIENANCE OR TE51 2 - MANUAL SCRAM. (11kV 5 HEE 15 FDR LICENSEE I C - REFULLING 3 - AUTOMATIC 50RAN. EVENT REPOR1 (LERI
  • b - REGULA10MY RL51kIC11bN 4 - biHER (EXPLAINI FILE (NUREG-01oll Y

'f E - OPERAIOM 1 RAINING + LICENSE E X AMIN 4110N k F - ADMIN 15TRAlivt (S)

[i G - OPERA 110NAL EkROK IEXPLAIN)

H - 01HERIEXPLAINI EKH!bli 1 - SAME SOURCE

[i H. .

I e

N u

CD CD LTI

Docket No. 50-277 Attach =ent to Monthly Operating Report

'# I REFUELING IMVRMATI0l?

1. Name of facility:

Peach Bottom Unit 2

2. Scheduled date for next refueling shutdown:

March 1, 1980 3 Scheduled date for restart following refueling:

June 6, 1980

h. Will refueling or resumption of operation thereafter require a technical specification change or o0her license amendment?

Yes.

If answer is yes, what, in general, will these be?

Technical specification changes to accoucdate reload fuel, Modifications to reactor core operating limits are expected.

5. Scheduled date (s) for submitting proposed licensir4 action and I supporting infomation:

February 8, 1980

6. Important licensing conciderations associated with refueling, e.g. ,

new or different fuel design or supplier, unreviewcd design or perfomance analysis methods, significant changes in fuel design, new operating arecedures Initial utilization of General Electric pre-pressurized

, Fuel Assemblies

.7 The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pools a Core - 76h Fuel Assemblies b)) Fuel pool - 618 Irradiated Fuel Assemblies

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

Original installed capacity is 1110 fuel assemblies. An' increase in capacity to 2816 fuel assemblies has been licensed, providing capacity for 1706 additional fuel assemblies. Plant modifications to be completed prior to next refueling.

9 The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

September, 1990.

2308 166

Y Docket No. 50-278 Attach =ent to Menthly Operat gport REFUELING INFORMATION

1. Name of facility:

Faach Bottom Unit 3

2. Scheduled date for next refueling shutdown:

September 8,1979 3 Scheduled date for restart following refueling:i October 27, 1979 ,

14 . Vill refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes.

If answer is yes, what, in general, will these be?

Technical specification changes to accomodate reload fuel.

Modifications to reactor core operating limits are expected.

5. Scheduled date (s) for submitting proposed licensing action and supporting information:

July 25, 1979

6. Important licensing considerations associated with refueling, e.g. ,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

Initial utilization of General' Electric pre-pressurized Fuel Assemblies

7. The number of fuel assemblies (a) in the core and (b) in the spent ,-

fuel storage pool:

(a) Core - 76h Fuel Assemblies (b) Fuel pool 1:L0 Irradiated Fuel Assemblies

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

Original installed capacity is 1110 fuel assemblies. An increase in capacity to 2816 fuel assemblies has been licensed, providing capacity for 1706 additional fuel asse:rblies. Plant modifications to be completed prior to next refueling.

9 The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

September, 1991. '

2308 167

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCES PEACH BOTTOM UNITS 2 & 3 Mav, 1979 UNIT 2 .

Unit 2 operated at rated power until May 4, when a 200 MWe reduction was required due to loss of condenser vacuum. The Unit returned to rated power on May 5 On May 13, a controlled shutdown was initiated to: acco=modate replacement of the recombiner conderiser tube bundle, replace the 2A recirculating pump seal, perform feedwater heater leak testing and complete cable modifications required to meet separation criteria. The Unit returned to service on May 24 During the startup ramp on May 25, a 50 MWe load drop occurred due to a recirculation pump runback initiated during feedwater control system balancing.

The load was recovered shortly thereafter. A small load reduction was begun on May 26 to set the final rod pattern.

  • Following the rod adjustment, the Unit reached full power on imy 28.

UNIT 3 Unit 3 operated at rated power until May 1, when the 'B' fee dwate r string was recoved from service due to excessive leakage in the 23 feedwater heater. The Unit operated at reduced load until May 18.

Another load reduction to 300 MWe was required to reduce off-gas radiation levels in order to repair the adjacent Unit 2 o f f-gas pipe elbow. Unit 3 load was returned to 940 59e on May 20. An outage is scheduled to begin on June 1 in order to replace the recombiner condenser and repair feedwater heater leaks.

2308 168

  • * *