ML19261D284
| ML19261D284 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 04/26/1979 |
| From: | Wetterhahn M CONNER, MOORE & CORBER |
| To: | Kornblith L, John Lamb, Milhollin G Atomic Safety and Licensing Board Panel |
| References | |
| NUDOCS 7906020072 | |
| Download: ML19261D284 (3) | |
Text
.,*
b ED,yj) 4 I.AW OFFICES CONNER. MOORE & CORBER 1747 PENNSTLVANIA AVENUE, N. W.
Taov a. con'N E R, J a.
WAS HINGTON. D. C. 20006 AmCu A.Mooms,Ja?
"""I.ts'r^,"O,,,
April 26, 1979 x
nowALn InALsLay, JR.
mosamT w. mADan *
(aoa) ass-asoo EERTH M. ELLIS
" wow passtvan as anc.
CA.B LE ADD R3 s s: ATOW LAW Gary L. Milhollin, Esq.
Mr. Lester Kornblith, Jr.
Chairman,- Atomic Safety Member, Atomic Safety and
'and Licensing Board Licensing Board Panel 1815 Jefferson Street U.S. Nuclear Regulatory Madison, Wisconsin 53711 Commission Washington, D. C.
205 I-Dr. James C.
Lamb, III
\\
Member, Atomic Safety and Licensing Board Panel d#u [y' h[W 313 Woodhaven Road Chapel Hill, N. C.
27514
/
h' I 6
In the Matter of d
Public Service Electric and Gas Company, et al.
A (Salem Nuclear Generating Station, Unit 1)
'o cp Docket No. 50-272 Gentlemen:
Because of a schedule conflict, Mr. Warren S. Nechodom of the Exxon Nuclear Corporation will replace Mr. John H.
Riddle on Licensee's witness panel in the forthcoming pro-ceedings.
Mr. Nechodom's professional qualifications are attached.
Sincerely, Mark J.
'etterhahn Counsel for the Licensee cc:
Chairman, Atomic Safety and Licensing Appeal Board Panel Chairman, Atomic Safety and Licensing Board Panel 2307 128 Barry Smith, Esq.
Richard Hluchan, Esq.
Richard Fryling, Jr., Esq.
Keith Onsdorff, Esq.
Sandra T. Ayres, Esq.
Mr. Alfred C. Coleman, Jr.
Mrs. Eleanor G. Coleman Carl Valore, Jr., Esq.
7906020072 Office of the Secretary h
June D. MacArtor, Esq.
j,b
_ 3.yya : - -":CB lC
-W
^%Y'.?.
OfG: $ 9-;
i WARREN S. NECHODOM 3
f4
/*
i s..,y q.,
Manager, Licensing and Compliance 7
h/
7 Quality Assurance and Licensing Department BS, Chemical Engin=ering, Gonzaga University, 1954 Mr. Nechodom joined Exxon Nuclear Company, Inc. in 1971 with responsibility for reload fuel licensing and for fabrication plant criticality analysis.
In 1974, he became Manager, Licensing cnd Compliance, with responsibility for all Exxon Nuclear Company licensing activities.
Mr. Nechodom began his nuclear career, in 1954, with the General Electric Company in Richland, Washington.
He held various technical and management positions in support of reactor operations including Supervisor, Process Physics, where he was responsible for providing process physics sup-port for N-reactor and Manager, Reactor Physics where he was responsible for all physics research and development programs for N-reactor.
In 1967, he transferred to Douglas United Nuclear when it assumed contractual responsibility for operation of N-reactor.
He continued as Manager, Reactor Physics, until 1968 when he became Manager, Nuclear Safety Technology, with 2307 129
/
responsibility for developing basic criteria and technical limits in the area of nuclear safety technology for inclusion in program scope proposals, technical criteria, bases for process standards and nuclear safety specifications and
~
bases for project and process design.
In 1970, he was named Director, N-Reactor Power-Only Study Group; responsible for planning scheduling and directing the development of a " power-only" fuel model for the N-reactor.
2307 130
/