ML19261C746
| ML19261C746 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 03/14/1979 |
| From: | Reaves T MISSISSIPPI POWER & LIGHT CO. |
| To: | Haass W Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19261C747 | List: |
| References | |
| AECM-79-17, NUDOCS 7903280361 | |
| Download: ML19261C746 (1) | |
Text
]
MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. BOX 1640 J AC K S ON MIS SIS SIP PI 3 9205 March 14, 1979 naoouction otraarucar Mr. W. P. Haass, Chief Quality Assurance Branch Division of Project Management U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Sir:
SUBJECT:
Grand Gulf Nuclear Station File 0272/0491 Operational QA Manual (Topical) - Rev. 0
- MAEC 78/90*
AECM-79/17 Mississippi Power & Light Company is submitting thirty-six (36) copies of Revision 0 to Topical Report Number MPL-TOP-1A, entitled " Operational Quality Assurance Manual", in accordance with the instructions contained in your letter dated December 11, 1978.
The program described in the report is being implemented on the Grand Gulf Nuclear Station and a copy of your December 11, 1978, letter and the enclosed Topical Report Evaluation is included in each copy as you requested.
Please destroy previous revisions of this Topical Report.
Yours truly, T. E. Reaves, Jr.
Manager of Quality Assurance WEE:lb
Attachment:
Rev. O to Operational QA Manual cc:
Mr. R. B. McGehee Mr. T. B. Conner Mr. N. L. Stampley File 903280 N r-Member Middle South Utilities System