ML19261C197

From kanterella
Jump to navigation Jump to search
Forwards 90-day Technical Rept on Secondary Containment Leak Rate Testing
Date released: 10/02/2019 Download: ML19261C197


Secondary Containment Leak Rate Test Conducted 780909 for 90-day Period.Concludes Secondary Containment Sys Is Capable of Maintaining Greater than 0.25 Inch of Water Vacuum
ML19261C198
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 09/09/1978
From:
TENNESSEE VALLEY AUTHORITY
To:
References
Download: ML19261C198 (24)
Forwards 90-day Technical Rept on Secondary Containment Leak Rate Testing
ML19261C196
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 03/14/1979
From: Gilleland J
TENNESSEE VALLEY AUTHORITY
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19261C196 (1)