Forwards QA Program Insp Rept 99900522/79-01 on 790108-11.No Noncompliance Noted
ML19261C066
Person / Time
Issue date: 01/19/1979
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Allen R
BECHTEL GROUP, INC., BECHTEL POWER CORP.
Shared Package
ML19261C067 List:
References
REF-QA-99900522 NUDOCS 7903140519
Download: ML19261C066 (2)


Text

.- C UNITED STATES ymsisoug{o NUCLEAR REGULATORY COMMISSION

./

[

REGION IV n

5.

E 611 RYAN PLAZA DRIVE, SUITE 1000

.,C AR LINGTON, T EX AS 76011

  • j l

o 19 JAN 1979 Docket No. 99900522/79-01 Bechtel Power Corporation San Francisco Power Division ATTN: Mr. R. D. Allen Vice President and Division Manager Post Office Box 3965 San Francisco, California 94119 Gentlemen:

This refers to the QA Program inspection conducted by Mr. R. H. Brickley of this office on January 8-11, 1979, of your facility at Ann Arbor, Michigan, and to the discussions of our findings with H. W. Wahl and members of your staff at the conclusion of the inspection.

Areas eunined during the QA Program inspection and our findings are discussed in the enclosed report. Within these areas, the inspection, consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

Within *ne scope of this inspection, we found no instance where you failed to meet NRC requirements.

In accordance with Section 2.790 of the Commission's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter together with the enclosed inspection report will be placed in the Commission's Public Document Room.

If this report contains any information that you believe to be proprietary, it is necessary that you make a written application within thirty (30) days to this office to withhold such in-formation from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document.

If we do not hear from you in this regard within the specified period, the report will be placed in'the Public Document Room.

\\

790314O N

Bechtel Power Corporation San Francisco Power Division Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

, (O 1

t._____

(sk Lt\\f3 Uldis Potapovs, Chie %

v fI Vendor Inspection Branch

Enclosure:

Inspection Report No. 99900522/79-01

%