ML19261B776

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 78-10 Re Bergen-Paterson Hydraulic Shock Suppressor Accumulator Spring Coils.Mechanism Is Not Utilized by Util
ML19261B776
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 02/06/1979
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 7903050571
Download: ML19261B776 (1)


Text

n Yd

]

MISSISSIPPI POWER & LIGHT COMPANY g,yg Helping Build Mississippi y,,

P. O. B O X 164 0, J AC K S O N. MIS SIS SIP PI 3 9 2 0 5 February 6,1979 3e P ee C D U C T s O N OEPARTMENT Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Region II - Suite 818 230 Peachtree Street, N. W.

Atlanta, Georgia 30303 ATIENTION:

Mr. J. P. O'Reilly, Director

Dear Mr. O' Reilly:

SUBJECT:

Grand Gulf Nuclear Station File 0270/L-860.0/10746 Evaluation of IE Bulletin 78-10 AECM-79/09 We have completed our review of IE Bulletin 78-10 entitled "Bergen-Paterson Hydraulic Shock Suppressor Accumulator Spring Coils".

This mechanism is not being utilized in either Unit 1 or Unit 2 of the Grand Gulf Nuclear Station.

Based on this finding, we are planning no further action in response to this bulletin.

Yours truly, J. P. McGaughy, Jr.

Director of Power Production JRF/db cc:

Mr. R. B. McGehee Mr. T. B. Conner Dr. Ernst Volgenau, Director Division of Inspection & Enforcement U. S. Nuclear Regulatory Coannission Washington, D. C.

20555 7908050 5 7/

ygf/

'gr# A Mer5ca **'

d'-

am

-