Forwards 790215 Interim Status Deficiency Rept EF2-44020, Torus Shell Indication at Ring Beam Attachment Weld Enlargement, for 30-day Period.Discusses Weld Repair Determined by Magnetic Particle or Liquid Penetrant
ML19261B647
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 02/21/1979
From: Fahrner W
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
EF-2-45-621, NUDOCS 7902280327
Download: ML19261B647 (3)


Text

'

  • Detroit 2 Edison =000Second Ave %e=-

February 21, 1979 EF2-45,621 Mr. James C. Keppler Regional Director Directorate of Regulatary Operations Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Subject:

10 CFR 50.55 (e) Deficiency Report On Torus Ring Beam Weld Indications

References:

(A) 10 CFR 50.55 (e) Deficiency Report Telephone Call of October 3, 1978, to NRC Region III (EF2-44,323 of October 5,1978)

(B) Interim Status Report EF2-44,333 of November 3, 1978 (C) Interim Status Report EF2-45,006 of December 1, 1978 ,

(D) Interim Status Report EF2-45,024 of January 3, 1979 (E) Interim Status Report EF2-44,020 of February 15, 1979 (Attachment)

Pursuant to the provisions of 10 CFR 50.55 (e), item (3), attached please find our interim status report EF2-44,020 of February 15, 1979.

By May 1, 1979, we will issue a complete report t'.at will summarize the nature and cause of the problem, the corrective measures taken, and any safety implications resulting from the repairs made.

Sincerely your,3,

[ '

[L k4x4^- -

W. . Fahrner Project Manager Enrico Fermi 2 WJF:RWB/pm Att.

cc: Mr. E. Volgenau, Director Of fice of Inspection and Enforcement Division of Reactor Inspection Programs U.S. Nuclear Regulatory Commission Washington, D.C. 20555 9\

\

790228032l

Detroit Edison _____ ENRICO FERMI UNIT 2 PROJECT ENGINEERING February 15, 1979 EF2 - 44020 RECEIVED To: R. W. Barr Project Quality Assurance Director FEDB 16197a 206 Engineering Construction-Troy R. W. gggg

, From: W. F.ColbertSEf, Project Engineer - EF2 333 Engineering Construction-Troy *

References:

1. Memorandum EF2-42243, " Report to NRC on Torus Ring Beam Weld Indications," dated November 1, 1978.
2. Memorandum EF2-42405, " Progress Report No. 2 to the NRC on Torus Ring Beam Weld Indications,"

dated December 1, 1978

3. Memorandum EF2-43685, " Progress Report No. 3 to the the NRC on the Torus Ring Beam Weld Indica-tions."

Subject:

Progress Report No. 4 to the NRC on the Torus Ring Beam Weld Indications Attached please find Engineering's fourth 30-day status report for the torus ring beam weld indications. A complete report will be made avail-able for your transmittal to the NRC by May 1,'1979.

Written by: D. F. Lehnert

/dk A Attachment cc: T. A. Alessi A. Rohrig W. M. Street Document Control W. J. Fahrner '

J. D. Ryan/A. Walker W. McNoughton (Failure Analysis Associates, E. Lusis A. Higginbotham (NUTECH)

L. E. Schuerman F. E. Gregor A. Lim A. Alexiou W. M. Street C. R. Bacon E. G. Shifrin

STATUS REPORT NO. 4 TORUS SHELL INDICATION AT THE RING BEAM ATTACHMENT WELD ENLARCEMENT INTRODUCTION As described in the attached report to the Reference 1 letter, the Fermi 2 Torus Modification Program requires that the existing 5/16" fillet veld between the ring girder at each mitered joint and the suppression chamber shell be increased to a 3/4" fillet weld. In the process of inspecting these welds, defects in the torus shell have been determined.

DESCRIPTION OF NON-CONFORMANCE A description of the defects is provided in the attachment to the Reference 1 letter.

CURRENT PROGRESS

1. Weld repair of the relevant indications determined by magnetic particle or liquid penetrant examination methods is in progress.
2. An ultrasonic examination of the completed weld enlargements for all the ring beams is in progress.
3. A metallurgical report compiling the detailed findings and conclusions of Failure Analysis Associates, after ev"luating ten (10) samples, will be available at the site for your review by March 1, 1979.

REFERENCES

1. Detroit Edison letter EF2-44333, W. J. Fahrner to James G. Keppler, dated November 3, 1978, "10 CFR 50.55(e) Deficiency Report on the Torus P'.g Beam Weld Indications."
2. Detroit Edison letter EF2-45006, W. J. Fahrner to James G. Keppler, dated December 1, 1978, "10 CFR 50.55(e) Deficiency Report on Torus Ring Beam Weld Indications.
3. Detroit Edison letter EF2-45024, W. J. Fahrner to James G. Keppler dated January 3, 1979, "10 CFR 50.55(e) Deficiency Report on Torus Ring Beam Weld Indications."

DFL/dk 2-15-79