|
---|
Category:CONSTRUCTION PERMITS & AMENDMENTS
MONTHYEARML20210B6221986-09-12012 September 1986 Amend 9 to CPPR-135 & CPPR-136,transferring Ownership Shares from Bangor-Hydro Electric Co,Maine Public Svc Co,Central Vermont Public Svc,Fitchburg Gas & Electric & Central Maine Power Co to Eua Power Corp ML20207E5361986-07-11011 July 1986 Amends 8 to CPPR-135 & CPPR-136,deleting Washington Electric Cooperative,Inc as Owner of Facility ML20211G9011986-06-10010 June 1986 Amends 7 to CPPR-135 & CPPR-136,granting Partial Exemption from GDC 4 of App a to 10CFR50 ML20054H9301982-06-23023 June 1982 Amend 5 to CPPR-135 & CPPR-136,reflecting Change in Facility Ownership from Commonwealth Electric Co to Canal Electric Co & Wa Electric Cooperative,Inc ML19343B5211980-12-12012 December 1980 Amends 4 to CPPR-135 & CPPR-136,providing for Transfer of Partial Ownership Shares ML19331C1021980-08-0606 August 1980 Amends 3 to CPPR-135 & CPPR-136,decreasing Percent Ownership Interest of Four Participants,Increasing Ownership Interest of Seven Participants,Adding One Participant & Reinstating One Participant as Applicant ML19261B6171979-01-31031 January 1979 Amend 2 to Const Permit CPPR-135 & Amend 2 to CPPR-136, Authorizing Transfers of Ownership Interests to Ma Municipal Wholesale Electric Co ML19259A6341978-12-27027 December 1978 Amend 1 to CPPR-135, & Amend 1 to CPPR-136, Adding 6 New Participants in Ownership of Facility 1986-09-12
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217C8411999-10-0505 October 1999 Amend 64 to License NPF-86,revising TSs 3.7.6.1 & 3.7.6.2 to Delete Restriction to Suspend All Operations Involving Positive Reactivity Changes During Plant Conditions Specified ML20212L1071999-10-0101 October 1999 Amend 63 to License NPF-86,relocating TS 3/4.7.10, Area Temperature Monitoring, & Associsted TS Table 3.7-3.to Technical Requirements Manual ML20212D0761999-09-17017 September 1999 Amend 62 to License NPF-86,revising TS 3.7.6.2 to Increase AOT for Control Room Air Conditioning Subsystem from 30 to 60 Days to Allow Adequate Time to Replace Portions of Existing System During Current Operating Cycle ML20210Q1631999-08-12012 August 1999 Amend 61 to License NPF-86,revising TS SR 4.5.2b.1 to Delete Prescribed Method of Venting ECCS Which Would Allow Alternate Method to Verify That ECCS Piping Will Be Full of Water ML20196G3531999-06-23023 June 1999 LAR 99-19 for License NPF-86,increasing AOT for Cracs from 30 Days to 60 Days on One Time Basis for Each Train to Facilitate on-line Implementation of Design Enhancements During Current Operating Cycle ML20207J6201999-03-15015 March 1999 Application for Amends to Licenses NPF-49 & NPF-86, Transferring Control of Licenses to Reflect Change in Upstream Economic Ownership of Parent Company of Nep,Vols I & Ii.Pages 48,49 & Annual Rept 1996 Pages 2 & 3 Omitted ML20204E3391999-03-12012 March 1999 Amend 60 to License NPF-86,revising TS Table 3.3-4 to Depict Change to Refueling Water Storage Tank low-low Level Setpoint ML20207G9261999-03-0505 March 1999 Suppl Application for Transfer of License NPF-86,requesting Consent for Transfer of Montaup Electric Co Interest in OL for Seabrook Station to Little Bay Power Corp ML20198E7781998-12-16016 December 1998 License Amend Request 98-09 to License NPF-86,either Revising Refs & Statements That Are Inaccurate or Providing Relief from Administrative Controls Which Provide Insignificant Safety Benefit ML20198E7291998-12-16016 December 1998 Application for Amend to License NPF-86.Amend Involves Relocation of TS 3/4.7.10 & Associated TS Table 3.7-3 to Technical Requirements Manual ML20155J1671998-11-0404 November 1998 LAR 98-17 to License NPF-86,revising TS SR 4.5.2b.1 to Remove Prescriptive Requirements of Using Venting Process as Sole Means to Verify That ECCS Piping Is Full of Water ML20154F9971998-09-29029 September 1998 Application 98-16 for Amend to License NPF-86,reflecting Removal of Montaup Electric Co & Addition of Little Bay Power Corp ML20249C6401998-06-24024 June 1998 Amend 58 to License NPF-86,revises TS 4.5.2.b.1 for ECCS Subsystems to Delete Requirements to Vent Operating Chemical Volume & Control Sys Centrifugal Charging Pump Casing ML20249B4161998-06-17017 June 1998 Revised LAR 98-07,reflecting Proposed Changes in LAR 98-07 W/Recently Issued License Amend 56 Which Split TS 3/4.7.6 Into Separate TSs,3/4.7.6.1 & 3/4.7.6.2 ML20247R6821998-05-20020 May 1998 LAR 97-07 to License NPF-86,revising Refueling Water Storage Tank low-low Level Setpoint ML20217E8611998-04-22022 April 1998 LAR 98-04 to License NPF-86,changing TS Surveillance Intervals to Accommodate 24 Month Fuel Cycle,Per GL 91-04 ML20216C7861998-04-0909 April 1998 Amend 56 to License NPF-86,revising App a TSs Re Requirements for Control Room Subsystems ML20216C5751998-04-0808 April 1998 Application 98-03 for Amend to License NPF-86,changing TS Surveillance Intervals to Accommodate 24-month Fuel Cycle, Per GL 91-04 ML20217Q2761998-04-0303 April 1998 Application for Amend to License NPF-86,LAR 98-02,proposing Changes to TS to Accomodate Fuel Cycles of Up to 24 Months, Per GL 91-04, Changes in TS Surveillance Intervals to Accommodate 24-Month Fuel Cycle ML20217M3671998-03-27027 March 1998 LAR 98-07 to License NPF-86,modifying Tech Specs 3.7.6, Control Room Emergency Makeup Air & Filtration Subsystem ML20236R9301998-03-26026 March 1998 Amend 55 to License NPF-86,modifing TS Sections 6.0, Administrative Control, to Reflect Recent Organizational Changes & Changes to Approval Title for Section Qualified Reviewer Program & Correcting Incorrect Ref in TS 6.4.3.9.b ML20217F0931998-03-23023 March 1998 Application for Amend to License NPF-86,proposing Administrative Change to TS to Incorporate Administrative Controls of New Specification 3.0.5,currently Approved for Use in NUREG-1431 ML20216H8341998-03-17017 March 1998 Amend 54 to License NPF-86,revising App a TSs Relating to Requirements for AC Power Sources,Changing Certain Requirements Related to EDG Stated in TS 3/4.8.1, AC Sources ML20217Q0971998-03-0505 March 1998 Application for Amend to License NPF-86,incorporating Programmatic Controls in TS for Radioactive Effluents & for Environ Monitoring Conforming to Applicable Regulatory Requirements ML20217N7231998-03-0202 March 1998 Application for Amend to License NPF-86,changing TS to Revise Frequency for Performance of Specific Surveillances & Delete Requirements for Accelerated Testing When Number of Valid Test Failures Associated W/Edgs Is Met or Exceeded ML20217N8151998-03-0202 March 1998 Application for Amend to License NPF-86,changing TS to Exclude Prescriptive Requirement to Vent Operating CVCS CCP Casing ML20211E9761997-09-26026 September 1997 Application for Amend (LAR 97-05),changing TS 3.7.6 by Separating Requirements for Control Room HVAC Sys Re Operation of Control Room Emergency Makeup Air & Filtration Sys Subsystem & Control Room Air Conditioning Subsys ML20141D5901997-06-24024 June 1997 Amend 53 to License NPF-86,modifying TS to Identify Fuel Assemblies Design Features ML20141D1391997-06-24024 June 1997 Amend 52 to License NPF-86,modifying TS 6.8.1.6.b to Include Reference to NRC W Topical Rept WCAP-12610-P-A, Vantage+Fuel Assembly Reference Core Rept, Dtd April 1995 ML20141B3521997-06-19019 June 1997 License Amend Request 97-03 to License,Revising TS Administrative Control 6.8.1.6.b to Include Ref to NRC Approved W Topical Rept WCAP-12610-P-A, Vantage + Fuel Assembly Ref Core Rept ML20148F9971997-05-29029 May 1997 License Amend Request 97-02,to License NPF-86,replacing Term Zircaloy W/Terminology That Identifies NRC Approved Westinghouse Fuel Assembly Design Consisting of Assemblies W/Either ZIRLO or Zircaloy-4 Fuel Cladding Matl ML20141B9781997-05-13013 May 1997 Amend 51 to License NPF-86,revising TSs Re Reactor Core Fuel Assembly Design Features Requirements Contained in TS 5.3.1, Fuel Assemblies ML20135F9261997-03-12012 March 1997 Amend 50 to License NPF-86 Revising App a TSs Related to in-core Detector Sys,Seismic Instrumentation,Meteorological Instrumentation & Turbine Overspeed Protection ML20135C1561997-02-24024 February 1997 Amend 49 to License NPF-86,revising Plant App a TSs 1.7, Containment Integrity, 3/4.6.1, Primary Containment, & 3/4.6.5, Containment Enclosure Bldg, to Incorporate Provisions of Option B to 10CFR50,App J ML20134Q3291997-02-18018 February 1997 Application for Amend to License NPF-86,changing Reactor Core Fuel Assembly Design Features Requirements Contained in Tech Specs 5.3.1, Fuel Assemblies ML20134L8591997-02-12012 February 1997 Application for Amend to License NPF-86,requesting Rev to TS Section 6.0 Re Administrative Controls ML20129B8211996-10-17017 October 1996 Application for Amend to License NPF-86,consisting of Change Request 96-02,proposing Changes That Involve Relocation of Four TS Re Instrumentation Requirements Contained in TS Section 3/4.3 ML20129B7631996-10-16016 October 1996 Application for Amend to License NPF-86,consisting of Change Request 96-06,proposing Four Changes Re EDG Requirements Contained in TS 3/4.8.1, AC Sources ML20117F8621996-08-30030 August 1996 Amend 48 to License NPF-86,revising TS 3.8.3.1,action A,To Increase from 8 H to 7 Days,Allowable Time That 480 Volt Bus E64 May Be Less than Fully Energized ML20113B1911996-06-20020 June 1996 License Amend Request 96-17 to License NPF-86,increasing Allowed Outage Time for Inoperable Svc Water Cooling Tower Loop Electrical Supply to Be Equivalent to Allowed Outage Time for Inoperable Svc Water Cooling Tower Loop ML20117K3051996-06-0404 June 1996 Application for Amend to License NPF-86,implementing Performance Based Containment Leak Rate Testing Program at Seabrook Station by Changing Tss.Request Submitted IAW 10CFR50,App J,Option B & Reg Guide 1.163 Requirements ML20108D9981996-05-0707 May 1996 Amend 47 to License NPF-86,revising App a TS 3.3.2, Engineered Safety Features Actuation Sys Instrumentation ML20095L0681995-12-21021 December 1995 Corrected Page 3/4 4-25 & 26 W/Overleaf for Completeness of Amend 46 to License NPF-86.Error Involved TS Page W/O Page & Amend Number ML20095L0641995-12-21021 December 1995 Corrected Pages 3/4 3-33,3/4 3-26 & 3/4 3-19 & 20 W/Overleafs for Completeness of Amends 45 & 46 to License NPF-86 ML20094R1741995-11-29029 November 1995 Amend 45 to License NPF-86.Amend Revises App a TS Re Relocation of Functional Unit 6.b, Feedwater Isolation - Low RCS Tavg Coincident with a Reactor Trip from TS 3.3.2 to Technical Requirements Manual ML20094P9741995-11-28028 November 1995 Amend 44 to License 44,revise App a TS Re RCS Leakage & Deletes Table 3.4-1 from TS Section 3.4.6.2 & Ref Table 3.4-1 from Limiting Condition for Operation 3.4.6.2 F ML20094F4371995-11-0202 November 1995 Amend 43 to License NPF-86,modifying App a TSs for Turbine Cycle Safety Valves ML20092M1011995-09-22022 September 1995 Application for Amend to License NPF-86,consisting of LAR 95-07 Re Automatic Switchover to Containment Sump/Rwst Level low-low ML20098A4711995-09-20020 September 1995 Application for Amend to License NPF-86,relocating Functional Unit 6.b, FW Isolation- Low RCS T Avg Coincident W/Rt from TS 3.3.2 to Plant TS Requirements Manual Licensee Controlled Document ML20092K2091995-09-20020 September 1995 Application for Amend to License NPF-86,changing TS 3/4.9.1 Re Refueling Boron Concentration (Ref NUREG-1431) 1999-09-17
[Table view] |
Text
f 4
UNITED S I TTES fg yV
/t NUCLEAR REGULATORY COMMisslON k ),./.7 ). f WASHINGTON, D. C. 20555
e PUBLIC SERVICE C0fPANi 0F ?!EW HAtPSHIRE THE UNITED ILLUMihATliiG COTPANY CENTRAL t'AINE POWER C0fPANY CEf1 TRAL VERfUTIT PUBLIC SERVICE CORPORATION F1TCHBURG GAS AND ELECTRIC LIGHT CutPANY fOflTAUP ELECTRIC C0fPAfiY fiEW BEDFORD GAS & EDISON LIGHT C0f?ANY fiEW EtiGLAND POWER COIPAriY TOWN OF HUDSON, IMSSACHUSETIS, LIGHT AND POLER DEPARTf1NT VLRfUNI ELECTRIC COOPERATIVE, liiC.
BANLOR HYDRU-ELECTRIC CUfPAtiY TAUitTOTl fUNICIPAL LIGHTit;G PLANT COM."lSSION T4ASSACHUSETIS fUtilCIPAL !.liOLESALL ELECTRIC CuiPANY fGif;E PUBLIC SERVICE C0fPANY DOCKET NO. 50-443 SEABROOK STAT 10il, UNIT 1 AlENDfENT TO COT 4STRUCT10N PERf4IT Amendment No. 2 Const.ruction Permit tio. CPPR-135 1.
The Nuclear Regulatory Comission (the Comission) having found that:
A.
The application for amendment contained in letters, dated fiay 15, 1978 and October 16, 1978, complies with +.he standards and requirements of the Atomic Energy Act of 1954, as amended, and the Comr.ission's rules and regulations set forth in 10 CFR Chapter I-,
B.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; C.
Each of the following is financially qualified to assume its ownership interest in the Seabrook Station, Unit 1, shown below:
Massachusetts Municipal Wholesale Electric Company 5.59249 Maine Public Service Company 1.46056 (Sua:
7.05305)
D.
flo increases in percent ownership are authorized for owners issued Construction Permit No. CPPR-135 as amenced by Amendment f;o.1.
1 17o2210222 E.
Af ter the transfer of ovmershio interests is completed, the percent ownership interest (shown below) for each of the following will b.?
equal to or less than its original percent ownership intert st as amended by Amendment No.1 (shown in parentheses) in the Seabrook Station, Unit 1.
(The percent ownership interests shown in 1.C, l.D and 1.E add up to one hundred percent.)
Public Service Company of New Hampshire -
50.00000 (50.00000)
The United Illuminating Company -
20.00000 (20.00000)
New England Pover Company 9.95766 (10.08160)
Central Maine Power Company -
2.54178 (2.54676)
Central Venaont Public Service Corporation -
1.59096 (1.59447)
The Connecticut Light and Power Company -
0.00000 (6.91364)
Vermont Electric Power Company, Inc. -
0.00000 (0.00026)
Fitchburg Gas and Electric Light Company -
0.60432 (0.60467)
Montaup Electric Company -
2.93531 (2.93903)
New Bedford Gas & Edison Light Company -
4.37370 (4.37635)
Town of Hudson, Massachusetts, Light and Pover Department -
0.05780 (0.05780)
Vermont Electric Cooperative, Inc. -
0.41259 (0.41259)
Bangor Hydro-Electric Company -
0.37249 (0.37249)
Taunton Municipal Lighting Plant Commission -
0.10034 (0.10034)
(Sun: 92.94695 100.00000) s F.
Prior public notice of this atvndment is not required since the amendment does not involve a significant hazards consideration.
2.
Accordingly, Construction Permit No. CPPR-135 is amended to reflect a change in the ownership of the f acility by deleting The Connecticut Light and Power Company, and the Vermont Eltctric Power Company, Inc.,
as aimers and by adding Massachusetts Municipal Wholesale Electric Company and Maine Public Service Company as owners and by transferring ownership interests as follows:
A.
The following paragraph (3G) is added to the construction periait:
3G The following percent ownership interests may be transferred from Transferors to Transferees:
To:
Massachusetts Municipal Wholesale Electric Company 5.59249 From:
Central Maine Power Company 0.00498 Central Vermont Public Service Co rpora t ion 0.00351 The Connecticut Light and Power Company 5.45308 Fitchburg Gas and Electric Light Company 0.00035 Montaup Electric Company 0.00372 New Bedford Gas & Edison Light Company 0.00265 New England Power Company 0.12394 Vermont Electric Power Company, Inc.
.00026 (Sum:
5.59249) i
_4 To:
Maine Public Service Company 1.40056 From:
The Connecticut Light and Power Company 1.46056 B.
In all references in Construction Permit No. CPPR-135 to
" applicants" excl ude:
The Connecticut Light and Power Company Vermont Electric Power Company, Inc.
and include:
Massachusetts Municipal Wholesale Electric Company Maine Public Service Company 3.
This amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/
3 Roger S. doyd, Di ector ih3 Division of Project Manage:reat Office of Nuclear Reactor Regulation Date of Issuance:
JAli 31 I373
8 4 e UNITED ST ATES
[*e
,t NUCLEAR REGULATORY COMMisslON
$ x h)C l
WASHINGTON, D. C. 20555
>j a
PUBLIC SERVICE C0fPANY OF NEW HAfPSHIRE THL UNITLD ILLutalf1A!!NG C0fPANY CENTRAL t'AINE P0kiR COTPANY CENTRAL VERtUf1T PUBLIC SERVICE CORPORATION FITCHBURG GAS AND ELECTRIC LIGHT C0tPANY tUNTAUP ELECTRIC C0fPANY NEW BEDFORD GAS & EDISON LIGHT C0fPANY f1EW ENGLAND POWER C0fPANY TOWN OF HUDSON, f/ASSACHUSETTS, LIGHT AND POWER DEPARTTENT VLRfUNT ELECTRIC C00PERATIVL, INC.
BANGUR HYORO-ELECTRIC C0fPANY TAUtlTON FUNICIPnl LIGHTING PLANT C0t&lSS10N MASSACHUSETIS tUNICIPAL F.HOLESALE ELECTRIC COFPANY t'AINE PUBLIC SERVICE COFPANY DOCKET NO. 50-444 SEABROOK STATION, UNIT 2 Af'ENDBENT TO CONSTRUCTION PERMIT Amendment No. 2 Construction Permit No. CPPR-136 1.
The Nuclear Regulatory Coniaission (the Commission) having found that:
A.
The application for amendment contained in letters, dated fay 15, 1978 and October 16, 1978, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended, and the Comaissicn's rules and regulations set forth in 10 CFR Chapter I-,
B.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; C.
Each of the following is financially qualified to assume its ownership interest in the Seabrook Station, Unit 2, shown below:
Massachusetts Municipal Wholesale Electric Company S.59249 Maine Public Service Company 1.46056 (Sun:
7.05305)
D.
No increases in percent ownership are authorized for owners issued Construction Permit No. CPPR-136 as amended by Amendment i;o.1.
. E.
Af ter the transfer of ownership interests is coupleted, the percent ownership interest (shon'n below) for each of the following will be equal to or less than its original percent otmership interest as amended by Amendment No.1 (shown in parentheses) in the Seabrook Station, Unit 2.
(The percent ownership interests shova in 1.C,1.0 and 1.E add up to one hundred percent.)
Public Service Company of New Hampshire -
50.00000 (50.00000)
The United Illuninating Company -
20.00000 (20.00000)
New England Power Company 9.95766 (10. 08160)
Central Maine Power Company -
2.54178 (2.54676)
Central Vermont Public Service Corporation -
1.59096 (1.59447)
The Connecticut Light and Power Company -
0.00000 (6.91364)
Vermont Electric Power Company, Inc. -
0.00000 (0.00026)
Fitchburg Gas and Electric Light Company -
0.60432 (0.60467)
Montaup Electric Company -
2.93531 (2.93903)
New Bedford Gas & Edison Light Company -
4.37370 (4.37635)
Town of Hudson, Massachusetts, Light and Power Department -
0.05780 (0.05780)
Vermont Electric Cooperative, Inc. -
0.41259 (0.41259)
Bangor P Jco-Electric Company -
0.37249 (0.37249)
Taunton Municipal Lighting Plant Cormission -
0.10034 (0.10034)
(Sun: 92.94695 100.00000'
. F.
Prior public notice of this ar:endment is not required since the amendment does not involve a significant hazards consideration.
2.
Accordingly, Construction Permit No. CPPR-136 is amended to reflect a change in the ovnership of the facility by deleting The Connecticut Light and Power Company, and the Vermont Electric Power Company, Inc.,
as ovmers and by adding Massachusetts Municipal Wholesale Electric Company and Maine Public Service Company os owners and by transferring ownership interests as follows:
A.
The following paragraph (3G) is added to the construction permit:
3G The following percent ownership interests may be transferred from Transferors to Transferees:
To:
Massachusetts Municipal Wholesale Electric Company 5.59249 Fren:
Central Maine Power Company 0.00498 Central Vermont Public Service Corporation 0.00351 The Connecticut Light and Power Company 5,45308 Fitchburg Gas and Electric Light Company 0.00035 Montaup Electric Company 0.00372 New Bedford Gas & Edison Light Company 0.00265 New England Power Company 0.12394 Vermont Electric Power Company, Inc.
.00026 (Sum:
5.59249)
.. To:
Maine Public Service Company 1.46056 From:
The Connecticut lignt and Power Company 1.46056 B.
In all references in Construction Permit No. CP?3-136 to
" applicants" excl ude:
The Connecticut Light and Power Company Vermont Electric Power Canpany, Inc.
and include:
Massachusetts Municipal Wholesale Electric Company Maine Public Service Company 3.
This amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGULATORY C0tGISSIOi' GRoger S. Boyd, Di r\\ector i
Division of Project Managdmon)
Office of Nuclear Reactor Regulation Date of Issuance:
JAN 31 IS73
-