ML19261B301

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Jan 1979
ML19261B301
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/09/1979
From: Murray T
TOLEDO EDISON CO.
To: Volgenau E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML19261B302 List:
References
L79-136, NUDOCS 7902150291
Download: ML19261B301 (1)


Text

' ~

r TOLEDO e EDISON February 9,1979 L79-136 FILE: RR 2 (P-6-79-01)

Docket No. 50-346 License No. NPF-3 Dr. Ernst Volgenau, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Doctor Volgenau:

Monthly Operating Report, January, 1979 Davis-Besse Nuclear Power Station Unit 1 Enclosed find ten copies of the Monthly Operating Report for Davis-Besse Nuclear Power Station Unit 1, for the month of January, 1979.

Also enclosed is Revision 1 to the Operating Data Report for December, 1979, to correct a typographical error.

Yours truly, Obh Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station TDM/JRL/1j k Enclosures .

cc: Mr. James G. Keppler Regional Director , Region III Encl: 1 Mr. William G. Mcdonald, Director Office of Management Inf ormat ion and Program Control Enc 1: 2 7902150951l 40 T

b 5 g CO! SON PLAZA 300 MAOISCN AVENUE TOLCDO,OH!O 43G52 )

TbE TOLEOC EDISCN COMPANY