ML19261A804
| ML19261A804 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 02/01/1979 |
| From: | David Williams ARKANSAS POWER & LIGHT CO. |
| To: | Reid R Office of Nuclear Reactor Regulation |
| References | |
| 1-019-19, 1-19-19, NUDOCS 7902080188 | |
| Download: ML19261A804 (1) | |
Text
,
l
_ ]
_:::d ARKANSAS POWER & LIGHT COMPANY POST Of flCE BOX 551 UTTLE ROCK. AR<ANSAS 72203 (501) 371-4000 February 1,1979 1-019-19 2-019-21 Director of Nuclear Reactor Regulation Attn:
Mr. R.11. Reid, Chief l
Operating Reactor 1 anch #4 U. S. Nuclear Regulatory Commission Ivashington, D. C. 20555
Subject:
Arkansas Nuclear One-Unit 1 and 2 Docket Nos. 50-313 and 50-36S License Nos. DPR-31 and NPF-6 Industrial Security Plan Deviation (File:
046S, 2-046S)
Gentlemen:
Our letter to you dated January 11, 1979, submitted a proposed revision to the Arkansas Nuclear One (ANO) Industrial Security Plan. Our Security Plan describes the security system and security measures used at ANO to provide protection of the plant against industrial sabotage. Presently, we expect to have a'l security equipment operable and procedures in effect on or before 10 CFR 73.55 compliance date of February 23, 1979.
Ilowever, we have recently become aware of the possibility of not having a piece of equipment installed and operabic by the compliance date. We have attached a description of the situation that could develop and our proposed contingency measures.
Please revicw the proposed contingency measures anc provide your concurrence with their acceptability no later than February 20, 1979.
Due to the proprietary nature of the attachnent, we regt:est that it be withheld from public disclosure pursuant to 10 CFR 2.790.
Very truly yours,
/
/
s D: niel 11. Williams Manager, Liccasing DlIX:DGM:1g Attachment hC O
gO 7 902 0 80 /f8 MEYPER MOOtc. SOUTH UTILITIES SYSTEM